If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012808D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.47027,"lon":-110.086207,"icon":""}]} |
Location: D0/08-28-040-01W4/0 | |
Location Alias: D0/08-28-40-01 W4M | |
Location Alias 2: D0/08-28-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 28 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 8-28-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0177695 | |
License Date: 1995-05-02 | |
License Status: Suspension | |
Spud Date: 1995-06-05 | |
Final Drill Date: 1995-06-10 | |
Well Total Depth: 1269.00 m | |
Surface Hole Latitude: 52.470270 | |
Surface Hole Longitude: -110.086207 |
Date | Event |
---|---|
1995-05-02 | Obtained License |
1995-06-06 | Surface Casing Operation Performed |
1995-06-07 | Direction Drilling Operation Performed - Horizontal |
1995-06-09 | Intermediate Casing Operation Performed |
1995-06-10 | Finished Drilling |
1995-06-10 | Well Mode changed to Drilled and Cased |
1995-06-11 | Liner Casing Operation Performed |
1995-06-11 | Perforation Treatment Performed - Slotted Liner or Casing |
1995-06-11 | Rig Released |
1995-06-11 | Well Log Performed |
1995-06-23 | Well Began Production |
1995-06-23 | Well Fluid changed to Crude Oil |
1995-06-23 | Well Mode changed to Pumping |
1995-06-30 | Well Log Performed |
2006-02-28 | Well Fluid changed to Crude Oil |
2006-02-28 | Well Mode changed to Suspended |
2008-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-06-07 | 609.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-06-11 | Slotted Liner | 977.00 | 1269.00 | 0 |
2008-06-08 | Packing Device Capped w/Cement | 580.00 | 866.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 3951 | 0.0 | 0.0 | 0.0 |
1996 | 8707 | 0.0 | 0.0 | 0.0 |
1997 | 8688 | 0.0 | 0.0 | 0.0 |
1998 | 8674 | 0.0 | 0.0 | 0.0 |
1999 | 8670 | 0.0 | 0.0 | 0.0 |
2000 | 8700 | 0.0 | 0.0 | 0.0 |
2001 | 8453 | 0.0 | 0.0 | 0.0 |
2002 | 7265 | 0.0 | 0.0 | 0.0 |
2003 | 5266 | 0.0 | 0.0 | 0.0 |
2004 | 4272 | 0.0 | 0.0 | 0.0 |
2005 | 360 | 0.0 | 0.0 | 0.0 |
2006 | 68 | 0.0 | 0.0 | 0.0 |
For data sources see[6]