X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012809000

Well Details

Well ID: 0404012809000
Loading map...
Location: 00/09-28-040-01W4/0
Location Alias: 00/09-28-40-01 W4M
Location Alias 2: 00/09-28-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI ET AL 9D HAYTER 9D-28-40-1
Operator Name: Rife Resources Ltd.
License Number: 0116201
License Date: 1985-07-17
License Status: Abandoned
Spud Date: 1985-09-06
Final Drill Date: 1985-09-10
Well Total Depth: 781.50 m
Surface Hole Latitude: 52.473215
Surface Hole Longitude: -110.078516

For data sources see[1][2]

Well History

Date Event
1985-07-17 Obtained License
1985-09-07 Surface Casing Operation Performed
1985-09-10 Finished Drilling
1985-09-10 Production Casing Operation Performed
1985-09-10 Well Log Performed
1985-09-10 Well Mode changed to Drilled and Cased
1985-09-11 Rig Released
1985-09-30 Well Log Performed
1985-10-01 Well Log Performed
1985-10-02 Perforation Treatment Performed - Jet Perforation
1985-10-08 Well Began Production
1985-10-08 Well Fluid changed to Crude Oil
1985-10-08 Well Mode changed to Pumping
2017-05-01 Well Fluid changed to Crude Oil
2017-05-01 Well Mode changed to Suspended
2017-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-18 Plug Back Performed
2017-08-18 Well Fluid changed to Crude Oil
2017-08-18 Well Log Performed
2017-08-18 Well Mode changed to Abandoned Zone
2017-09-06 Well Abandoned
2017-09-06 Well Fluid changed to Crude Oil
2017-09-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-02 Perforation 774.00 776.00 13
1985-10-02 Perforation 777.00 778.50 13
2017-08-18 Packing Device Capped w/Cement 761.00 769.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2111 0.0 0.0 0.0
1986 4595 0.0 0.0 0.0
1987 5846 0.0 0.0 0.0
1988 6163 0.0 0.0 0.0
1989 5560 0.0 0.0 0.0
1990 7270 0.0 0.0 0.0
1991 1349 0.0 0.0 0.0
1995 5644 0.0 0.0 0.0
1996 8320 0.0 0.0 0.0
1997 8005 0.0 0.0 0.0
1998 8512 0.0 0.0 0.0
1999 8437 0.0 0.0 0.0
2000 8368 0.0 0.0 0.0
2001 8466 0.0 0.0 0.0
2002 8257 0.0 0.0 0.0
2003 8054 0.0 0.0 0.0
2004 8444 0.0 0.0 0.0
2005 7827 0.0 0.0 0.0
2006 8588 0.0 0.0 0.0
2007 8054 0.0 0.0 0.0
2008 7945 0.0 0.0 0.0
2009 7254 0.0 0.0 0.0
2010 4763 0.0 0.0 0.0
2011 8242 0.0 0.0 0.0
2012 8428 0.0 0.0 0.0
2013 7164 0.0 0.0 0.0
2014 8288 0.0 0.0 0.0
2015 7012 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References