X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012812A00

Well Details

Well ID: 0404012812A00
Loading map...
Location: A0/12-28-040-01W4/0
Location Alias: A0/12-28-40-01 W4M
Location Alias 2: A0/12-28-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 12-28-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0154924
License Date: 1992-12-04
License Status: Issued
Spud Date: 1992-12-16
Final Drill Date: 1992-12-17
Well Total Depth: 825.00 m
Surface Hole Latitude: 52.472033
Surface Hole Longitude: -110.095537

For data sources see[1][2]

Well History

Date Event
1992-12-04 Obtained License
1992-12-16 Surface Casing Operation Performed
1992-12-17 Finished Drilling
1992-12-17 Well Mode changed to Drilled and Cased
1992-12-18 Production Casing Operation Performed
1992-12-18 Well Log Performed
1992-12-19 Rig Released
1993-01-06 Perforation Treatment Performed - Jet Perforation
1993-01-07 Perforation Treatment Performed - Jet Perforation
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Suspended
1998-08-05 Perforation Treatment Performed - Cement Squeeze
1998-08-07 Perforation Treatment Performed - Open-Hole Completion
1998-08-08 Perforation Treatment Performed - Jet Perforation
1998-08-08 Well Log Performed
1998-08-09 Perforation Treatment Performed - Jet Perforation
1998-08-12 Well Log Performed
1998-08-25 Well Began Injection
1998-08-25 Well Fluid changed to Water
1998-08-25 Well Type changed to Disposal
1999-10-27 Liner Casing Operation Performed
2001-07-04 Perforation Treatment Performed - Jet Perforation
2001-07-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-06 Perforation 778.00 779.00 13
2001-07-04 Perforation 795.00 803.00 13
1993-01-06 Perforation 780.50 781.50 13
1993-01-07 Perforation 783.50 785.50 13
1998-08-05 Cement Squeeze 778.00 785.50 0
1998-08-07 Open Hole/Barefoot Completion 823.00 825.00 0
1998-08-08 Perforation 819.00 821.50 13
1998-08-08 Perforation 803.00 805.00 13
1998-08-08 Perforation 805.00 808.00 13
1998-08-09 Perforation 816.00 820.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7267 0.0 0.0 0.0
1994 8666 0.0 0.0 0.0
1995 8080 0.0 0.0 0.0
1996 4679 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1999-10-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References