X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012812D00

Well Details

Well ID: 0404012812D00
Loading map...
Location: D0/12-28-040-01W4/0
Location Alias: D0/12-28-40-01 W4M
Location Alias 2: D0/12-28-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 12-28-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0154923
License Date: 1992-12-04
License Status: Suspension
Spud Date: 1992-12-19
Final Drill Date: 1993-01-06
Well Total Depth: 830.00 m
Surface Hole Latitude: 52.472977
Surface Hole Longitude: -110.094672

For data sources see[1][2]

Well History

Date Event
1992-12-04 Obtained License
1992-12-20 Surface Casing Operation Performed
1993-01-04 Direction Drilling Operation Performed - Deviate
1993-01-06 Finished Drilling
1993-01-06 Production Casing Operation Performed
1993-01-06 Rig Released
1993-01-06 Well Log Performed
1993-01-06 Well Mode changed to Drilled and Cased
1993-01-11 Perforation Treatment Performed - Jet Perforation
1993-01-22 Well Log Performed
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
2001-07-20 Well Fluid changed to Crude Oil
2001-07-20 Well Mode changed to Suspended
2003-10-16 Well Log Performed
2003-11-05 Well Log Performed
2003-11-06 Well Log Performed
2004-03-27 Perforation Treatment Performed - Cement Squeeze
2004-03-27 Plug Back Performed
2004-03-27 Well Fluid changed to Crude Oil
2004-03-27 Well Mode changed to Abandoned Zone
2004-03-31 Perforation Treatment Performed - Jet Perforation
2004-03-31 Well Log Performed
2004-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-04 412.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-11 Perforation 790.00 791.00 13
1993-01-11 Perforation 791.80 793.00 13
2004-03-27 Cement Squeeze 790.00 791.00 0
2004-03-27 Cement Squeeze 791.80 793.00 0
2004-03-31 Perforation 814.00 820.00 17
2004-03-31 Perforation 808.00 814.00 17
2004-03-31 Perforation 803.00 808.00 17
2004-10-22 Packing Device Capped w/Cement 787.00 797.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7267 0.0 0.0 0.0
1994 8666 0.0 0.0 0.0
1995 8111 0.0 0.0 0.0
1996 8646 0.0 0.0 0.0
1997 8573 0.0 0.0 0.0
1998 8208 0.0 0.0 0.0
1999 8548 0.0 0.0 0.0
2000 8606 0.0 0.0 0.0
2001 3010 0.0 0.0 0.0

For data sources see[6]

References