If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404012911000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/11-29-040-01W4/0 | |
Location Alias: 00/11-29-40-01 W4M | |
Location Alias 2: 00/11-29-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: TAC HAYTER 11-29-40-1 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0125634 | |
License Date: 1987-01-23 | |
License Status: Suspension | |
Spud Date: 1987-01-31 | |
Final Drill Date: 1987-02-03 | |
Well Total Depth: 825.00 m | |
Surface Hole Latitude: 52.472422 | |
Surface Hole Longitude: -110.118528 |
Date | Event |
---|---|
1987-01-23 | Obtained License |
1987-02-02 | Surface Casing Operation Performed |
1987-02-03 | Finished Drilling |
1987-02-03 | Well Log Performed |
1987-02-03 | Well Mode changed to Drilled and Cased |
1987-02-04 | Well Log Performed |
1987-02-07 | Production Casing Operation Performed |
1987-02-07 | Rig Released |
1987-02-24 | Perforation Treatment Performed - Jet Perforation |
1987-02-24 | Well Log Performed |
1987-03-01 | Well Began Production |
1987-03-01 | Well Fluid changed to Crude Oil |
1987-03-01 | Well Mode changed to Pumping |
1987-08-15 | Well Fluid changed to Crude Oil |
1987-08-15 | Well Mode changed to Suspended |
1988-01-08 | Well Fluid changed to Crude Oil |
1988-01-08 | Well Mode changed to Pumping |
1988-10-13 | Well Fluid changed to Crude Oil |
1988-10-13 | Well Mode changed to Suspended |
2000-02-07 | Well Fluid changed to Crude Oil |
2000-02-07 | Well Mode changed to Pumping |
2000-06-02 | Perforation Treatment Performed - Jet Perforation |
2002-11-01 | Well Fluid changed to Crude Oil |
2002-11-01 | Well Mode changed to Suspended |
2007-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-09-18 | Perforation Treatment Performed - Jet Perforation |
2013-09-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-02-24 | Perforation | 768.00 | 769.00 | 13 |
1987-02-24 | Perforation | 770.20 | 772.50 | 13 |
2000-06-02 | Perforation | 770.90 | 771.90 | 13 |
2000-06-02 | Perforation | 772.30 | 776.30 | 13 |
2007-07-02 | Packing Device Capped w/Cement | 755.00 | 764.00 | 0 |
2013-09-18 | Perforation | 683.00 | 685.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 3472 | 0.0 | 0.0 | 0.0 |
1988 | 6551 | 0.0 | 0.0 | 0.0 |
2000 | 2884 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]