X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013006000

Well Details

Well ID: 0404013006000
Loading map...
Location: 00/06-30-040-01W4/0
Location Alias: 00/06-30-40-01 W4M
Location Alias 2: 00/06-30-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 6-30-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0110617
License Date: 1984-11-08
License Status: Suspension
Spud Date: 1984-11-10
Final Drill Date: 1984-11-13
Well Total Depth: 794.50 m
Surface Hole Latitude: 52.470259
Surface Hole Longitude: -110.142513

For data sources see[1][2]

Well History

Date Event
1984-11-08 Obtained License
1984-11-11 Surface Casing Operation Performed
1984-11-13 Finished Drilling
1984-11-13 Well Log Performed
1984-11-13 Well Mode changed to Drilled and Cased
1984-11-14 Drill Stem Test Performed
1984-11-15 Production Casing Operation Performed
1984-11-15 Rig Released
1984-11-17 Perforation Treatment Performed - Jet Perforation
1984-11-17 Well Log Performed
1984-11-26 Well Began Production
1984-11-26 Well Fluid changed to Crude Oil
1984-11-26 Well Mode changed to Pumping
1988-05-20 Perforation Treatment Performed - Jet Perforation
1988-12-21 Perforation Treatment Performed - Jet Perforation
1988-12-22 Perforation Treatment Performed - Cement Squeeze
1988-12-28 Perforation Treatment Performed - Jet Perforation
1989-01-13 Perforation Treatment Performed - Jet Perforation
1989-01-21 Perforation Treatment Performed - Cement Squeeze
1989-01-21 Perforation Treatment Performed - Jet Perforation
1989-01-23 Perforation Treatment Performed - Jet Perforation
2006-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-31 Well Fluid changed to Crude Oil
2007-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-17 Perforation 747.00 753.50 13
1989-01-23 Perforation 747.00 753.50 13
2006-10-18 Packing Device Capped w/Cement 734.00 742.00 0
1988-05-20 Perforation 750.00 753.50 13
1988-05-20 Perforation 756.00 758.00 13
1988-12-21 Perforation 766.00 768.00 14
1988-12-22 Cement Squeeze 747.00 768.00 0
1988-12-28 Perforation 747.00 753.50 13
1989-01-13 Perforation 756.00 758.00 13
1989-01-21 Perforation 766.00 768.00 13
1989-01-21 Cement Squeeze 747.00 768.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 845 0.0 0.0 0.0
1985 7460 0.0 0.0 0.0
1986 7948 0.0 0.0 0.0
1987 8281 0.0 0.0 0.0
1988 7844 0.0 0.0 0.0
1989 8507 0.0 0.0 0.0
1990 8681 0.0 0.0 0.0
1991 8646 0.0 0.0 0.0
1992 8686 0.0 0.0 0.0
1993 8582 0.0 0.0 0.0
1994 8611 0.0 0.0 0.0
1995 8596 0.0 0.0 0.0
1996 8633 0.0 0.0 0.0
1997 8555 0.0 0.0 0.0
1998 8587 0.0 0.0 0.0
1999 8368 0.0 0.0 0.0
2000 7324 0.0 0.0 0.0
2001 310 0.0 0.0 0.0
2002 24 0.0 0.0 0.0

For data sources see[5]

References