X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013011B00

Well Details

Well ID: 0404013011B00
Loading map...
Location: B0/11-30-040-01W4/0
Location Alias: B0/11-30-40-01 W4M
Location Alias 2: B0/11-30-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 11-30-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0129099
License Date: 1987-10-08
License Status: Suspension
Spud Date: 1987-10-28
Final Drill Date: 1987-10-31
Well Total Depth: 810.00 m
Surface Hole Latitude: 52.470946
Surface Hole Longitude: -110.142091

For data sources see[1][2]

Well History

Date Event
1987-10-08 Obtained License
1987-10-29 Surface Casing Operation Performed
1987-10-31 Finished Drilling
1987-10-31 Well Log Performed
1987-10-31 Well Mode changed to Drilled and Cased
1987-11-01 Production Casing Operation Performed
1987-11-01 Rig Released
1987-11-06 Perforation Treatment Performed - Jet Perforation
1987-12-07 Well Began Production
1987-12-07 Well Fluid changed to Crude Oil
1987-12-07 Well Mode changed to Pumping
1988-05-17 Perforation Treatment Performed - Jet Perforation
1994-08-16 Perforation Treatment Performed - Cement Squeeze
1994-08-19 Perforation Treatment Performed - Jet Perforation
1998-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-01 Well Fluid changed to Crude Oil
2007-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-06 Perforation 749.00 751.00 13
1988-05-17 Perforation 753.50 756.00 13
1994-08-16 Cement Squeeze 749.00 756.00 0
1994-08-19 Perforation 749.00 751.50 13
1998-11-03 Acid Treatment 749.00 751.50 0
2006-10-16 Packing Device Capped w/Cement 735.00 743.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 576 0.0 0.0 0.0
1988 8632 0.0 0.0 0.0
1989 8494 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8509 0.0 0.0 0.0
1992 8716 0.0 0.0 0.0
1993 7477 0.0 0.0 0.0
1994 4664 0.0 0.0 0.0
1995 8411 0.0 0.0 0.0
1996 8628 0.0 0.0 0.0
1997 8638 0.0 0.0 0.0
1998 3360 0.0 0.0 0.0
1999 8336 0.0 0.0 0.0
2000 8608 0.0 0.0 0.0
2001 8592 0.0 0.0 0.0
2002 6414 0.0 0.0 0.0
2003 7647 0.0 0.0 0.0
2004 7331 0.0 0.0 0.0
2005 2671 0.0 0.0 0.0

For data sources see[5]

References