If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013011B30 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.471937,"lon":-110.14042,"icon":""}]} |
Location: B3/11-30-040-01W4/0 | |
Location Alias: B3/11-30-40-01 W4M | |
Location Alias 2: B3/11-30-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 30 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 11-30-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0180648 | |
License Date: 1995-09-12 | |
License Status: Suspension | |
Spud Date: 1995-10-07 | |
Final Drill Date: 1995-10-09 | |
Well Total Depth: 790.00 m | |
Surface Hole Latitude: 52.471937 | |
Surface Hole Longitude: -110.140420 |
Date | Event |
---|---|
1995-09-12 | Obtained License |
1995-10-08 | Surface Casing Operation Performed |
1995-10-09 | Finished Drilling |
1995-10-09 | Well Log Performed |
1995-10-09 | Well Mode changed to Drilled and Cased |
1995-10-10 | Production Casing Operation Performed |
1995-10-10 | Rig Released |
1995-10-14 | Perforation Treatment Performed - Jet Perforation |
1995-10-18 | Well Began Production |
1995-10-18 | Well Fluid changed to Crude Oil |
1995-10-18 | Well Mode changed to Pumping |
2006-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-01 | Well Fluid changed to Crude Oil |
2007-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-10-14 | Perforation | 752.00 | 755.00 | 13 |
1995-10-14 | Perforation | 757.50 | 759.00 | 13 |
2006-10-14 | Packing Device Capped w/Cement | 735.00 | 743.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1791 | 0.0 | 0.0 | 0.0 |
1996 | 8626 | 0.0 | 0.0 | 0.0 |
1997 | 8550 | 0.0 | 0.0 | 0.0 |
1998 | 8641 | 0.0 | 0.0 | 0.0 |
1999 | 8481 | 0.0 | 0.0 | 0.0 |
2000 | 8530 | 0.0 | 0.0 | 0.0 |
2001 | 6761 | 0.0 | 0.0 | 0.0 |
2002 | 8655 | 0.0 | 0.0 | 0.0 |
2003 | 5627 | 0.0 | 0.0 | 0.0 |
2006 | 1776 | 0.0 | 0.0 | 0.0 |
2007 | 5087 | 0.0 | 0.0 | 0.0 |
For data sources see[5]