If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013011B40 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.471919,"lon":-110.140861,"icon":""}]} |
Location: B4/11-30-040-01W4/0 | |
Location Alias: B4/11-30-40-01 W4M | |
Location Alias 2: B4/11-30-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 30 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 11-30-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0189731 | |
License Date: 1996-07-18 | |
License Status: Suspension | |
Spud Date: 1996-07-27 | |
Final Drill Date: 1996-07-29 | |
Well Total Depth: 803.00 m | |
Surface Hole Latitude: 52.471919 | |
Surface Hole Longitude: -110.140861 |
Date | Event |
---|---|
1996-07-18 | Obtained License |
1996-07-28 | Direction Drilling Operation Performed - Deviate |
1996-07-28 | Surface Casing Operation Performed |
1996-07-29 | Finished Drilling |
1996-07-29 | Well Log Performed |
1996-07-29 | Well Mode changed to Drilled and Cased |
1996-07-30 | Production Casing Operation Performed |
1996-07-30 | Rig Released |
1996-08-08 | Perforation Treatment Performed - Jet Perforation |
1996-08-09 | Well Began Production |
1996-08-09 | Well Fluid changed to Crude Oil |
1996-08-09 | Well Mode changed to Pumping |
1996-09-03 | Well Log Performed |
2006-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-31 | Well Fluid changed to Crude Oil |
2007-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-07-28 | 328.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-08-08 | Perforation | 760.00 | 764.00 | 13 |
2006-10-13 | Packing Device Capped w/Cement | 746.00 | 754.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3136 | 0.0 | 0.0 | 0.0 |
1997 | 8631 | 0.0 | 0.0 | 0.0 |
1998 | 8548 | 0.0 | 0.0 | 0.0 |
1999 | 8422 | 0.0 | 0.0 | 0.0 |
2000 | 7920 | 0.0 | 0.0 | 0.0 |
2001 | 7946 | 0.0 | 0.0 | 0.0 |
2002 | 2662 | 0.0 | 0.0 | 0.0 |
For data sources see[6]