If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013012D30 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.472341,"lon":-110.143837,"icon":""}]} |
Location: D3/12-30-040-01W4/0 | |
Location Alias: D3/12-30-40-01 W4M | |
Location Alias 2: D3/12-30-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 30 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 12-30-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0146182 | |
License Date: 1990-11-06 | |
License Status: Suspension | |
Spud Date: 1990-11-10 | |
Final Drill Date: 1990-11-14 | |
Well Total Depth: 801.00 m | |
Surface Hole Latitude: 52.472341 | |
Surface Hole Longitude: -110.143837 |
Date | Event |
---|---|
1990-11-06 | Obtained License |
1990-11-11 | Surface Casing Operation Performed |
1990-11-14 | Finished Drilling |
1990-11-14 | Well Log Performed |
1990-11-14 | Well Mode changed to Drilled and Cased |
1990-11-15 | Production Casing Operation Performed |
1990-11-15 | Rig Released |
1990-11-17 | Perforation Treatment Performed - Jet Perforation |
1990-11-20 | Well Began Production |
1990-11-20 | Well Fluid changed to Crude Oil |
1990-11-20 | Well Mode changed to Pumping |
1991-01-15 | Perforation Treatment Performed - Cement Squeeze |
1991-01-15 | Perforation Treatment Performed - Jet Perforation |
1991-01-17 | Perforation Treatment Performed - Jet Perforation |
1999-06-08 | Well Fluid changed to Crude Oil |
1999-06-08 | Well Mode changed to Suspended |
2004-05-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-11-17 | Perforation | 748.00 | 751.00 | 13 |
1990-11-17 | Perforation | 751.00 | 754.00 | 13 |
1991-01-15 | Perforation | 760.80 | 761.80 | 13 |
1991-01-15 | Cement Squeeze | 760.80 | 761.80 | 0 |
1991-01-17 | Perforation | 748.00 | 754.00 | 13 |
2004-05-11 | Packing Device Capped w/Cement | 730.00 | 738.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 852 | 0.0 | 0.0 | 0.0 |
1991 | 8569 | 0.0 | 0.0 | 0.0 |
1992 | 8531 | 0.0 | 0.0 | 0.0 |
1993 | 8660 | 0.0 | 0.0 | 0.0 |
1994 | 8581 | 0.0 | 0.0 | 0.0 |
1995 | 8536 | 0.0 | 0.0 | 0.0 |
1996 | 8014 | 0.0 | 0.0 | 0.0 |
1997 | 8359 | 0.0 | 0.0 | 0.0 |
1998 | 6019 | 0.0 | 0.0 | 0.0 |
For data sources see[5]