If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013013A20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.475167,"lon":-110.143882,"icon":""}]} |
Location: A2/13-30-040-01W4/0 | |
Location Alias: A2/13-30-40-01 W4M | |
Location Alias 2: A2/13-30-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 30 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 13-30-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0139797 | |
License Date: 1989-05-15 | |
License Status: Suspension | |
Spud Date: 1989-06-03 | |
Final Drill Date: 1989-06-05 | |
Well Total Depth: 800.00 m | |
Surface Hole Latitude: 52.475167 | |
Surface Hole Longitude: -110.143882 |
Date | Event |
---|---|
1989-05-15 | Obtained License |
1989-06-03 | Surface Casing Operation Performed |
1989-06-05 | Finished Drilling |
1989-06-05 | Production Casing Operation Performed |
1989-06-05 | Rig Released |
1989-06-05 | Well Log Performed |
1989-06-05 | Well Mode changed to Drilled and Cased |
1989-06-08 | Perforation Treatment Performed - Jet Perforation |
1989-06-15 | Well Began Production |
1989-06-15 | Well Fluid changed to Crude Oil |
1989-06-15 | Well Mode changed to Pumping |
1989-07-18 | Perforation Treatment Performed - Jet Perforation |
1995-12-01 | Well Fluid changed to Crude Oil |
1995-12-01 | Well Mode changed to Suspended |
2003-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-10-05 | Plug Back Performed |
2003-10-05 | Well Fluid changed to Crude Oil |
2003-10-05 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-06-08 | Perforation | 756.50 | 759.00 | 13 |
1989-07-18 | Perforation | 759.00 | 761.50 | 13 |
2003-10-05 | Packing Device Capped w/Cement | 741.00 | 749.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 4626 | 0.0 | 0.0 | 0.0 |
1990 | 8727 | 0.0 | 0.0 | 0.0 |
1991 | 8595 | 0.0 | 0.0 | 0.0 |
1992 | 8645 | 0.0 | 0.0 | 0.0 |
1993 | 8442 | 0.0 | 0.0 | 0.0 |
1994 | 8093 | 0.0 | 0.0 | 0.0 |
1995 | 1185 | 0.0 | 0.0 | 0.0 |
For data sources see[5]