X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013014A00

Well Details

Well ID: 0404013014A00
Loading map...
Location: A0/14-30-040-01W4/0
Location Alias: A0/14-30-40-01 W4M
Location Alias 2: A0/14-30-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 14-30-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0129110
License Date: 1987-10-08
License Status: Abandoned
Spud Date: 1987-10-22
Final Drill Date: 1987-10-24
Well Total Depth: 812.00 m
Surface Hole Latitude: 52.474310
Surface Hole Longitude: -110.138099

For data sources see[1][2]

Well History

Date Event
1987-10-08 Obtained License
1987-10-22 Surface Casing Operation Performed
1987-10-24 Finished Drilling
1987-10-24 Well Log Performed
1987-10-24 Well Mode changed to Drilled and Cased
1987-10-25 Production Casing Operation Performed
1987-10-26 Rig Released
1987-11-02 Perforation Treatment Performed - Jet Perforation
1987-12-07 Well Began Production
1987-12-07 Well Fluid changed to Crude Oil
1987-12-07 Well Mode changed to Pumping
1988-06-21 Well Fluid changed to Crude Oil
1988-06-21 Well Mode changed to Suspended
1988-06-22 Perforation Treatment Performed - Cement Squeeze
1988-06-24 Perforation Treatment Performed - Jet Perforation
1989-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-01 Well Began Injection
1990-01-01 Well Fluid changed to Water
1990-01-01 Well Type changed to Disposal
1992-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-01 Plug Back Performed
1992-10-01 Well Abandoned
1992-10-01 Well Fluid changed to Water
1992-10-01 Well Mode changed to Abandoned
1992-10-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-02 Perforation 770.00 772.00 13
1988-06-22 Cement Squeeze 770.00 772.00 0
1988-06-24 Perforation 795.00 799.00 13
1989-03-23 Acid Treatment 795.00 799.00 0
1992-10-01 Packing Device Capped w/Cement 774.00 782.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 576 0.0 0.0 0.0
1988 4099 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

References