If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013014C20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.473803,"lon":-110.138811,"icon":""}]} |
Location: C2/14-30-040-01W4/0 | |
Location Alias: C2/14-30-40-01 W4M | |
Location Alias 2: C2/14-30-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 30 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 14-30-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0172595 | |
License Date: 1994-11-16 | |
License Status: Suspension | |
Spud Date: 1994-11-23 | |
Final Drill Date: 1994-11-29 | |
Well Total Depth: 1097.00 m | |
Surface Hole Latitude: 52.473803 | |
Surface Hole Longitude: -110.138811 |
Date | Event |
---|---|
1994-11-16 | Obtained License |
1994-11-23 | Surface Casing Operation Performed |
1994-11-25 | Direction Drilling Operation Performed - Horizontal |
1994-11-27 | Intermediate Casing Operation Performed |
1994-11-28 | Well Log Performed |
1994-11-29 | Finished Drilling |
1994-11-29 | Liner Casing Operation Performed |
1994-11-29 | Perforation Treatment Performed - Slotted Liner or Casing |
1994-11-29 | Rig Released |
1994-11-29 | Well Mode changed to Drilled and Cased |
1994-12-04 | Well Began Production |
1994-12-04 | Well Fluid changed to Crude Oil |
1994-12-04 | Well Mode changed to Pumping |
1994-12-08 | Well Log Performed |
2006-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-12-05 | Well Fluid changed to Crude Oil |
2006-12-05 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-11-25 | 636.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-29 | Slotted Liner | 897.80 | 1097.00 | 0 |
2006-12-02 | Packing Device Capped w/Cement | 393.00 | 825.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 423 | 0.0 | 0.0 | 0.0 |
1995 | 7211 | 0.0 | 0.0 | 0.0 |
1996 | 8548 | 0.0 | 0.0 | 0.0 |
1997 | 8638 | 0.0 | 0.0 | 0.0 |
1998 | 8451 | 0.0 | 0.0 | 0.0 |
1999 | 8669 | 0.0 | 0.0 | 0.0 |
2000 | 8596 | 0.0 | 0.0 | 0.0 |
2001 | 8663 | 0.0 | 0.0 | 0.0 |
2002 | 456 | 0.0 | 0.0 | 0.0 |
2003 | 2243 | 0.0 | 0.0 | 0.0 |
For data sources see[6]