If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013302042 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.480618,"lon":-110.081678,"icon":""}]} |
Location: 04/02-33-040-01W4/2 | |
Location Alias: 04/02-33-40-01 W4M | |
Location Alias 2: 04/02-33-040-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 33 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 2-33-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0175224 | |
License Date: 1995-01-23 | |
License Status: Suspension | |
Spud Date: 1995-05-10 | |
Final Drill Date: 1995-05-13 | |
Well Total Depth: 874.00 m | |
Surface Hole Latitude: 52.480618 | |
Surface Hole Longitude: -110.081678 |
Date | Event |
---|---|
1995-01-23 | Obtained License |
1995-05-10 | Surface Casing Operation Performed |
1995-05-12 | Direction Drilling Operation Performed - Deviate |
1995-05-13 | Finished Drilling |
1995-05-13 | Production Casing Operation Performed |
1995-05-13 | Rig Released |
1995-05-13 | Well Log Performed |
1995-05-13 | Well Mode changed to Drilled and Cased |
1995-06-02 | Well Log Performed |
1995-06-03 | Perforation Treatment Performed - Jet Perforation |
1995-08-15 | Well Log Performed |
2003-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-26 | Perforation Treatment Performed - Jet Perforation |
2003-07-26 | Plug Back Performed |
2003-07-26 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-05-12 | 228.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-06-03 | Perforation | 803.00 | 807.00 | 13 |
2003-07-26 | Packing Device Capped w/Cement | 792.00 | 800.00 | 0 |
2003-07-26 | Perforation | 712.00 | 714.00 | 17 |
2003-07-26 | Perforation | 715.00 | 716.50 | 17 |
For data sources see[5]