If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013305D20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.484737,"lon":-110.096528,"icon":""}]} |
Location: D2/05-33-040-01W4/0 | |
Location Alias: D2/05-33-40-01 W4M | |
Location Alias 2: D2/05-33-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 33 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB HAYTER 5-33-40-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0223761 | |
License Date: 1999-06-18 | |
License Status: Suspension | |
Spud Date: 1999-07-24 | |
Final Drill Date: 1999-07-26 | |
Well Total Depth: 828.00 m | |
Surface Hole Latitude: 52.484737 | |
Surface Hole Longitude: -110.096528 |
Date | Event |
---|---|
1999-06-18 | Obtained License |
1999-07-25 | Surface Casing Operation Performed |
1999-07-26 | Finished Drilling |
1999-07-26 | Well Log Performed |
1999-07-27 | Production Casing Operation Performed |
1999-07-27 | Rig Released |
1999-07-27 | Well Mode changed to Drilled and Cased |
1999-07-30 | Perforation Treatment Performed - Jet Perforation |
1999-08-03 | Well Began Production |
1999-08-03 | Well Fluid changed to Crude Oil |
1999-08-03 | Well Mode changed to Pumping |
1999-08-04 | Well Fluid changed to Crude Oil |
1999-08-04 | Well Mode changed to Pumping |
1999-08-27 | Perforation Treatment Performed - Jet Perforation |
2001-03-23 | Perforation Treatment Performed - Jet Perforation |
2001-03-23 | Well Log Performed |
2001-05-24 | Perforation Treatment Performed - Jet Perforation |
2001-05-24 | Well Log Performed |
2001-06-29 | Perforation Treatment Performed - Jet Perforation |
2001-06-29 | Well Log Performed |
2005-06-12 | Well Log Performed |
2006-04-15 | Well Fluid changed to Crude Oil |
2006-04-15 | Well Mode changed to Suspended |
2008-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-06-17 | Plug Back Performed |
2008-06-17 | Well Fluid changed to Crude Oil |
2008-06-17 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-07-30 | Perforation | 773.50 | 775.50 | 13 |
1999-07-30 | Perforation | 784.50 | 785.50 | 13 |
1999-08-27 | Perforation | 778.50 | 782.50 | 13 |
2001-03-23 | Perforation | 772.50 | 773.50 | 14 |
2001-05-24 | Perforation | 772.50 | 778.50 | 30 |
2001-06-29 | Perforation | 778.50 | 782.50 | 30 |
2008-06-17 | Packing Device Capped w/Cement | 753.20 | 761.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 3558 | 0.0 | 0.0 | 0.0 |
2000 | 8660 | 0.0 | 0.0 | 0.0 |
2001 | 8598 | 0.0 | 0.0 | 0.0 |
2002 | 8695 | 0.0 | 0.0 | 0.0 |
2003 | 8494 | 0.0 | 0.0 | 0.0 |
2004 | 7719 | 0.0 | 0.0 | 0.0 |
2005 | 4370 | 0.0 | 0.0 | 0.0 |
2006 | 2192 | 0.0 | 0.0 | 0.0 |
For data sources see[5]