X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013306000

Well Details

Well ID: 0404013306000
Loading map...
Location: 00/06-33-040-01W4/0
Location Alias: 00/06-33-40-01 W4M
Location Alias 2: 00/06-33-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 6-33-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0108077
License Date: 1984-07-05
License Status: Suspension
Spud Date: 1984-08-04
Final Drill Date: 1984-08-06
Well Total Depth: 836.00 m
Surface Hole Latitude: 52.484378
Surface Hole Longitude: -110.094254

For data sources see[1][2]

Well History

Date Event
1984-07-05 Obtained License
1984-08-04 Surface Casing Operation Performed
1984-08-06 Finished Drilling
1984-08-06 Well Log Performed
1984-08-06 Well Mode changed to Drilled and Cased
1984-08-08 Production Casing Operation Performed
1984-08-08 Rig Released
1984-09-04 Well Log Performed
1984-09-30 Well Log Performed
1984-10-01 Perforation Treatment Performed - Jet Perforation
1984-11-25 Well Began Production
1984-11-25 Well Fluid changed to Crude Oil
1984-11-25 Well Mode changed to Pumping
1988-03-02 Perforation Treatment Performed - Jet Perforation
1988-03-02 Well Log Performed
1988-03-03 Perforation Treatment Performed - Cement Squeeze
1988-03-08 Well Log Performed
1988-03-09 Perforation Treatment Performed - Jet Perforation
1995-03-05 Well Fluid changed to Crude Oil
1995-03-05 Well Mode changed to Suspended
2004-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-01 Perforation 781.50 786.00 13
1988-03-02 Perforation 790.20 790.50 13
1988-03-03 Cement Squeeze 781.50 790.50 0
1988-03-09 Perforation 782.00 786.50 13
2004-05-26 Packing Device Capped w/Cement 767.70 775.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 844 0.0 0.0 0.0
1985 5876 0.0 0.0 0.0
1986 2645 0.0 0.0 0.0
1987 6551 0.0 0.0 0.0
1988 4232 0.0 0.0 0.0
1992 1410 0.0 0.0 0.0
1993 3134 0.0 0.0 0.0
1994 6333 0.0 0.0 0.0
1995 158 0.0 0.0 0.0
1997 10 0.0 0.0 0.0

For data sources see[5]

References