X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013315040

Well Details

Well ID: 0404013315040
Loading map...
Location: 04/15-33-040-01W4/0
Location Alias: 04/15-33-40-01 W4M
Location Alias 2: 04/15-33-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 15-33-40-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0271870
License Date: 2002-07-17
License Status: Issued
Spud Date: 2002-07-28
Final Drill Date: 2002-07-30
Well Total Depth: 855.00 m
Surface Hole Latitude: 52.490070
Surface Hole Longitude: -110.084925

For data sources see[1][2]

Well History

Date Event
2002-07-17 Obtained License
2002-07-29 Direction Drilling Operation Performed - Deviate
2002-07-29 Surface Casing Operation Performed
2002-07-30 Finished Drilling
2002-07-31 Production Casing Operation Performed
2002-07-31 Rig Released
2002-07-31 Well Log Performed
2002-07-31 Well Mode changed to Drilled and Cased
2002-10-17 Perforation Treatment Performed - Jet Perforation
2002-10-17 Well Log Performed
2002-10-19 Well Began Production
2002-10-19 Well Fluid changed to Crude Oil
2002-10-19 Well Mode changed to Pumping
2006-06-04 Well Log Performed
2006-06-05 Well Log Performed
2006-06-15 Perforation Treatment Performed - Cement Squeeze
2006-06-20 Perforation Treatment Performed - Jet Perforation
2006-06-20 Well Log Performed
2006-06-27 Well Log Performed
2007-02-01 Well Began Injection
2007-02-01 Well Fluid changed to Water
2007-02-01 Well Type changed to Disposal
2019-05-01 Well Fluid changed to Water
2019-05-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-07-29 260.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-17 Perforation 809.00 811.00 20
2006-06-15 Cement Squeeze 809.00 811.00 0
2006-06-20 Perforation 828.00 833.00 17
2006-06-20 Perforation 824.00 828.00 17
2006-06-20 Perforation 823.00 824.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1764 0.0 0.0 0.0
2003 7637 0.0 0.0 0.0
2004 6568 0.0 0.0 0.0
2005 8694 0.0 0.0 0.0
2006 3450 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References