X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404013401032

Well Details

Well ID: 0404013401032
Loading map...
Location: 03/01-34-040-01W4/2
Location Alias: 03/01-34-40-01 W4M
Location Alias 2: 03/01-34-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 34
County/Municipality: Municipal District of Provost No. 52
Well Name: NORCENINT ET AL 1B3 HAYTER 1-34-40-1
Operator Name: Harvest Operations Corp.
License Number: 0182644
License Date: 1995-11-30
License Status: Suspension
Spud Date: 1995-12-16
Final Drill Date: 1995-12-18
Well Total Depth: 907.00 m
Surface Hole Latitude: 52.479136
Surface Hole Longitude: -110.056711

For data sources see[1][2]

Well History

Date Event
1995-11-30 Obtained License
1995-12-16 Surface Casing Operation Performed
1995-12-18 Direction Drilling Operation Performed - Deviate
1995-12-18 Finished Drilling
1995-12-18 Well Mode changed to Drilled and Cased
1995-12-19 Well Log Performed
1995-12-20 Production Casing Operation Performed
1995-12-20 Rig Released
1995-12-29 Well Log Performed
1996-01-15 Perforation Treatment Performed - Jet Perforation
1996-01-15 Well Log Performed
2008-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-04 Perforation Treatment Performed - Jet Perforation
2008-04-04 Plug Back Performed
2008-04-04 Well Log Performed
2008-04-05 Well Began Production
2008-04-05 Well Fluid changed to Crude Oil
2008-04-05 Well Mode changed to Pumping
2019-07-01 Well Fluid changed to Crude Oil
2019-07-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-12-18 593.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-15 Perforation 828.00 831.20 13
1996-01-15 Perforation 832.70 834.20 13
2008-04-04 Packing Device Capped w/Cement 813.00 823.00 0
2008-04-04 Perforation 770.00 772.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5643 0.0 0.0 0.0
2009 7425 0.0 0.0 0.0
2010 8498 0.0 0.0 0.0
2011 7492 0.0 0.0 0.0
2012 6563 0.0 0.0 0.0
2013 7940 0.0 0.0 0.0
2014 7606 0.0 0.0 0.0
2015 7868 0.0 0.0 0.0
2016 7857 0.0 0.0 0.0
2017 780 0.0 0.0 0.0

For data sources see[6]

References