X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030510D00

Well Details

Well ID: 0404030510D00
Loading map...
Location: D0/10-05-040-03W4/0
Location Alias: D0/10-05-40-03 W4M
Location Alias 2: D0/10-05-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 10D PROVOST 10-5-40-3
Operator Name: West Lake Energy Corp.
License Number: 0149262
License Date: 1991-06-25
License Status: Suspension
Spud Date: 1991-07-25
Final Drill Date: 1991-07-27
Well Total Depth: 861.00 m
Surface Hole Latitude: 52.415563
Surface Hole Longitude: -110.392642

For data sources see[1][2]

Well History

Date Event
1991-06-25 Obtained License
1991-07-25 Direction Drilling Operation Performed - Deviate
1991-07-26 Surface Casing Operation Performed
1991-07-27 Finished Drilling
1991-07-27 Well Log Performed
1991-07-27 Well Mode changed to Drilled and Cased
1991-07-28 Production Casing Operation Performed
1991-07-28 Rig Released
1991-09-06 Perforation Treatment Performed - Jet Perforation
1991-09-06 Well Log Performed
1991-11-27 Well Began Production
1991-11-27 Well Fluid changed to Crude Oil
1991-11-27 Well Mode changed to Pumping
2000-06-26 Perforation Treatment Performed - Cement Squeeze
2000-06-30 Perforation Treatment Performed - Jet Perforation
2000-07-01 Well Log Performed
2003-06-30 Well Fluid changed to Crude Oil
2003-06-30 Well Mode changed to Suspended
2006-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-14 Plug Back Performed
2006-02-14 Well Fluid changed to Crude Oil
2006-02-14 Well Log Performed
2006-02-14 Well Mode changed to Abandoned Zone
2006-02-18 Perforation Treatment Performed - Jet Perforation
2006-02-18 Well Log Performed
2006-03-10 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-07-25 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-09-06 Perforation 819.00 822.00 13
2000-06-26 Cement Squeeze 819.00 822.00 0
2000-06-30 Perforation 819.00 821.50 17
2006-02-14 Packing Device Capped w/Cement 803.00 811.00 0
2006-02-18 Perforation 776.20 778.20 32
2006-03-10 Fracture 776.20 778.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 840 0.0 0.0 0.0
1992 7809 0.0 0.0 0.0
1993 7336 0.0 0.0 0.0
1994 8308 0.0 0.0 0.0
1995 8151 0.0 0.0 0.0
1996 7706 0.0 0.0 0.0
1997 8225 0.0 0.0 0.0
1998 6200 0.0 0.0 0.0
1999 850 0.0 0.0 0.0
2000 4311 0.0 0.0 0.0
2001 7673 0.0 0.0 0.0

For data sources see[6]

References