If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404033415022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.488271,"lon":-110.355967,"icon":""}]} |
| Location: 02/15-34-040-03W4/2 | |
| Location Alias: 02/15-34-40-03 W4M | |
| Location Alias 2: 02/15-34-040-03 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 34 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: BOW RIVER PROVOST 15-34-40-3 | |
| Operator Name: Bow River Energy Ltd. | |
| License Number: 0158328 | |
| License Date: 1993-05-17 | |
| License Status: Abandoned | |
| Spud Date: 1993-09-13 | |
| Final Drill Date: 1993-09-17 | |
| Well Total Depth: 862.00 m | |
| Surface Hole Latitude: 52.488271 | |
| Surface Hole Longitude: -110.355967 |
| Date | Event |
|---|---|
| 1993-05-17 | Obtained License |
| 1993-09-14 | Surface Casing Operation Performed |
| 1993-09-16 | Direction Drilling Operation Performed - Deviate |
| 1993-09-17 | Finished Drilling |
| 1993-09-17 | Lost Circulation Occurred |
| 1993-09-17 | Well Mode changed to Drilled and Cased |
| 1993-09-18 | Well Log Performed |
| 1993-09-19 | Production Casing Operation Performed |
| 1993-09-19 | Rig Released |
| 1993-09-20 | Well Log Performed |
| 1993-10-01 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-01 | Well Log Performed |
| 1993-10-03 | Perforation Treatment Performed - Cement Squeeze |
| 1993-10-06 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-06 | Well Log Performed |
| 1994-09-09 | Well Log Performed |
| 1996-04-02 | Perforation Treatment Performed - Jet Perforation |
| 1996-04-02 | Well Began Production |
| 1996-04-02 | Well Fluid changed to Crude Oil |
| 1996-04-02 | Well Mode changed to Pumping |
| 2003-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-08-27 | Perforation Treatment Performed - Cement Squeeze |
| 2003-08-27 | Plug Back Performed |
| 2003-08-27 | Well Fluid changed to Crude Oil |
| 2003-08-27 | Well Mode changed to Abandoned Zone |
| 2004-06-10 | Well Log Performed |
| 2013-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-07-26 | Perforation Treatment Performed - Jet Perforation |
| 2013-07-26 | Well Log Performed |
| 2013-07-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-07-28 | Perforation Treatment Performed - Remedial Casing |
| 2013-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-07-31 | Perforation Treatment Performed - Jet Perforation |
| 2013-07-31 | Well Log Performed |
| 2013-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-08-02 | Perforation Treatment Performed - Remedial Casing |
| 2013-08-29 | Well Log Performed |
| 2013-08-30 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-02 | Perforation Treatment Performed - Remedial Casing |
| 2013-09-19 | Well Log Performed |
| 2013-09-23 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-23 | Well Log Performed |
| 2013-09-24 | Perforation Treatment Performed - Remedial Casing |
| 2013-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-26 | Plug Back Performed |
| 2014-05-29 | Well Abandoned |
| 2014-05-29 | Well Fluid changed to Crude Oil |
| 2014-05-29 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1993-09-16 | 552.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1993-10-01 | Perforation | 798.50 | 800.00 | 18 |
| 2013-07-26 | Acid Treatment | 719.40 | 722.40 | 0 |
| 2013-07-28 | Remedial Casing Cementing | 719.40 | 722.40 | 0 |
| 2013-07-28 | Packing Device Capped w/Cement | 708.00 | 718.00 | 0 |
| 2013-07-31 | Perforation | 406.00 | 409.00 | 17 |
| 2013-07-31 | Perforation | 406.00 | 409.00 | 20 |
| 2013-07-31 | Acid Treatment | 406.00 | 409.00 | 0 |
| 2013-08-02 | Remedial Casing Cementing | 406.00 | 409.00 | 0 |
| 2013-08-02 | Packing Device Capped w/Cement | 394.50 | 404.00 | 0 |
| 2013-08-30 | Perforation | 314.00 | 317.00 | 20 |
| 2013-08-30 | Perforation | 314.00 | 317.00 | 17 |
| 1993-10-03 | Cement Squeeze | 798.50 | 800.00 | 0 |
| 2013-09-01 | Acid Treatment | 314.00 | 317.00 | 0 |
| 2013-09-02 | Remedial Casing Cementing | 314.00 | 317.00 | 0 |
| 2013-09-02 | Packing Device Capped w/Cement | 296.00 | 310.00 | 0 |
| 2013-09-23 | Perforation | 217.40 | 220.40 | 17 |
| 2013-09-23 | Perforation | 217.40 | 220.40 | 20 |
| 2013-09-24 | Remedial Casing Cementing | 217.40 | 220.40 | 0 |
| 2013-09-26 | Packing Device Capped w/Cement | 205.80 | 213.80 | 0 |
| 1993-10-06 | Perforation | 801.50 | 803.00 | 17 |
| 1996-04-02 | Perforation | 796.00 | 799.00 | 13 |
| 2003-08-27 | Cement Squeeze | 796.00 | 799.00 | 0 |
| 2003-08-27 | Cement Squeeze | 801.50 | 803.00 | 0 |
| 2003-08-27 | Packing Device Capped w/Cement | 785.50 | 793.50 | 0 |
| 2013-07-26 | Perforation | 719.40 | 722.40 | 17 |
| 2013-07-26 | Perforation | 719.40 | 722.40 | 20 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 6401 | 0.0 | 0.0 | 0.0 |
| 1997 | 8214 | 0.0 | 0.0 | 0.0 |
| 1998 | 8671 | 0.0 | 0.0 | 0.0 |
| 1999 | 7826 | 0.0 | 0.0 | 0.0 |
| 2000 | 8642 | 0.0 | 0.0 | 0.0 |
| 2001 | 7221 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1993-09-17 | Lost Circulation | 862.00 | 862.00 |
| 2013-08-06 | No Incident Encountered | 0.00 | 0.00 |
| 2013-09-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]