X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404071315000

Well Details

Well ID: 0404071315000
Loading map...
Location: 00/15-13-040-07W4/0
Location Alias: 00/15-13-40-07 W4M
Location Alias 2: 00/15-13-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: RSO HZ PROVOST 15-13-40-7
Operator Name: Rifle Shot Oil Corp.
License Number: 0478671
License Date: 2016-01-06
License Status: Issued
Spud Date: 2016-01-20
Final Drill Date: 2016-01-24
Well Total Depth: 1560.00 m
Surface Hole Latitude: 52.449668
Surface Hole Longitude: -110.865544

For data sources see[1][2]

Well History

Date Event
2016-01-06 Obtained License
2016-01-21 Surface Casing Operation Performed
2016-01-22 Direction Drilling Operation Performed - Deviate
2016-01-22 Direction Drilling Operation Performed - Horizontal
2016-01-24 Finished Drilling
2016-01-24 Well Log Performed
2016-01-24 Well Mode changed to Drilled and Cased
2016-01-25 Production Casing Operation Performed
2016-01-26 Rig Released
2016-02-04 Perforation Treatment Performed - Jet Perforation
2016-02-16 Well Began Production
2016-02-16 Well Fluid changed to Crude Oil
2016-02-16 Well Mode changed to Pumping
2018-08-07 Perforation Treatment Performed - Jet Perforation
2018-08-08 Perforation Treatment Performed - Cement Squeeze
2018-08-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-20 Tempco Drilling Company Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-22 527.80 Deviate (5 - 79 degrees)
2016-01-22 959.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-04 Perforation 1345.00 1540.00 7
2018-08-07 Perforation 1323.50 1324.50 20
2018-08-08 Cement Squeeze 1323.50 1324.50 0
2018-08-09 Perforation 1205.00 1310.00 7

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7437 0.0 0.0 0.0
2017 8467 0.0 0.0 0.0
2018 8548 0.0 0.0 0.0
2019 8664 0.0 0.0 0.0
2020 1911 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-26 No Incident Encountered 0.00 0.00
2016-02-08 No Incident Encountered 0.00 0.00
2018-08-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References