X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072009030

Well Details

Well ID: 0404072009030
Loading map...
Location: 03/09-20-040-07W4/0
Location Alias: 03/09-20-40-07 W4M
Location Alias 2: 03/09-20-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 9-20-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0156747
License Date: 1993-02-24
License Status: Issued
Spud Date: 1993-03-17
Final Drill Date: 1993-03-20
Well Total Depth: 953.00 m
Surface Hole Latitude: 52.458000
Surface Hole Longitude: -110.966393

For data sources see[1][2]

Well History

Date Event
1993-02-24 Obtained License
1993-03-18 Direction Drilling Operation Performed - Deviate
1993-03-18 Surface Casing Operation Performed
1993-03-20 Finished Drilling
1993-03-20 Production Casing Operation Performed
1993-03-20 Well Log Performed
1993-03-20 Well Mode changed to Drilled and Cased
1993-03-21 Rig Released
1993-04-07 Well Log Performed
1993-05-03 Perforation Treatment Performed - Jet Perforation
1993-05-10 Well Began Production
1993-05-10 Well Fluid changed to Crude Oil
1993-05-10 Well Mode changed to Pumping
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Perforation Treatment Performed - Jet Perforation
2006-07-25 Plug Back Performed
2006-07-25 Well Fluid changed to Crude Oil
2006-07-25 Well Log Performed
2006-07-25 Well Mode changed to Abandoned Zone
2006-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-28 Perforation Treatment Performed - Jet Perforation
2006-07-28 Plug Back Performed
2006-07-28 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-18 217.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-05-03 Perforation 882.00 884.00 13
2006-07-25 Packing Device Capped w/Cement 866.00 874.00 0
2006-07-25 Perforation 824.00 827.00 17
2006-07-25 Perforation 821.50 822.50 17
2006-07-28 Packing Device Capped w/Cement 807.00 815.00 0
2006-07-28 Perforation 780.00 781.00 17
2006-07-28 Perforation 777.00 779.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5585 0.0 0.0 0.0
1994 8676 0.0 0.0 0.0
1995 8603 0.0 0.0 0.0
1996 8645 0.0 0.0 0.0
1997 1558 0.0 0.0 0.0
1998 8669 0.0 0.0 0.0
1999 8712 0.0 0.0 0.0
2000 8610 0.0 0.0 0.0
2001 8726 0.0 0.0 0.0
2002 8684 0.0 0.0 0.0
2003 7817 0.0 0.0 0.0
2004 4552 0.0 0.0 0.0

For data sources see[6]

References