X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072102D20

Well Details

Well ID: 0404072102D20
Loading map...
Location: D2/02-21-040-07W4/0
Location Alias: D2/02-21-40-07 W4M
Location Alias 2: D2/02-21-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 2-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0155296
License Date: 1992-12-22
License Status: Abandoned
Spud Date: 1993-01-15
Final Drill Date: 1993-01-19
Well Total Depth: 913.00 m
Surface Hole Latitude: 52.451852
Surface Hole Longitude: -110.951550

For data sources see[1][2]

Well History

Date Event
1992-01-19 Well Log Performed
1992-12-22 Obtained License
1993-01-15 Surface Casing Operation Performed
1993-01-16 Direction Drilling Operation Performed - Deviate
1993-01-19 Finished Drilling
1993-01-19 Production Casing Operation Performed
1993-01-19 Well Log Performed
1993-01-19 Well Mode changed to Drilled and Cased
1993-01-20 Rig Released
1993-01-26 Perforation Treatment Performed - Jet Perforation
1993-02-01 Well Began Production
1993-02-01 Well Fluid changed to Crude Oil
1993-02-01 Well Log Performed
1993-02-01 Well Mode changed to Pumping
1993-03-03 Perforation Treatment Performed - Jet Perforation
1999-05-04 Well Fluid changed to Crude Oil
1999-05-04 Well Mode changed to Suspended
2009-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-20 Plug Back Performed
2009-08-20 Well Fluid changed to Crude Oil
2009-08-20 Well Mode changed to Abandoned Zone
2014-06-25 Well Abandoned
2014-06-25 Well Fluid changed to Crude Oil
2014-06-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-16 233.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-26 Perforation 842.00 843.50 13
1993-01-26 Perforation 843.00 844.00 13
1993-03-03 Perforation 844.00 846.00 13
2009-08-20 Packing Device Capped w/Cement 828.00 837.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7814 0.0 0.0 0.0
1994 8656 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8656 0.0 0.0 0.0
1997 8697 0.0 0.0 0.0
1998 8243 0.0 0.0 0.0
1999 68 0.0 0.0 0.0

For data sources see[6]

References