X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072103A02

Well Details

Well ID: 0404072103A02
Loading map...
Location: A0/03-21-040-07W4/2
Location Alias: A0/03-21-40-07 W4M
Location Alias 2: A0/03-21-040-07 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 3-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0123478
License Date: 1986-07-15
License Status: Issued
Spud Date: 1986-07-21
Final Drill Date: 1986-07-23
Well Total Depth: 1007.00 m
Surface Hole Latitude: 52.448949
Surface Hole Longitude: -110.953497

For data sources see[1][2]

Well History

Date Event
1986-07-15 Obtained License
1986-07-21 Surface Casing Operation Performed
1986-07-23 Finished Drilling
1986-07-23 Well Log Performed
1986-07-23 Well Mode changed to Drilled and Cased
1986-07-24 Production Casing Operation Performed
1986-07-24 Rig Released
1986-08-02 Perforation Treatment Performed - Jet Perforation
1989-12-07 Perforation Treatment Performed - Jet Perforation
1993-02-26 Perforation Treatment Performed - Cement Squeeze
1993-02-28 Perforation Treatment Performed - Jet Perforation
1993-02-28 Well Log Performed
1995-08-28 Perforation Treatment Performed - Cement Squeeze
1995-09-04 Perforation Treatment Performed - Open-Hole Completion
1999-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-25 Perforation Treatment Performed - Jet Perforation
1999-11-25 Plug Back Performed
1999-11-25 Well Mode changed to Drilled and Cased
1999-12-01 Well Began Injection
1999-12-01 Well Fluid changed to Water
1999-12-01 Well Type changed to Injection
1999-12-02 Well Fluid changed to Water
1999-12-02 Well Type changed to Injection
2002-07-19 Well Log Performed
2015-09-16 Well Fluid changed to Water
2015-09-16 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-08-02 Perforation 829.50 833.00 13
1989-12-07 Perforation 833.00 835.00 13
1993-02-26 Cement Squeeze 829.50 835.00 0
1993-02-28 Perforation 854.00 861.00 13
1995-08-28 Cement Squeeze 854.00 861.00 0
1995-09-04 Open Hole/Barefoot Completion 880.00 1007.00 0
1999-11-25 Packing Device Capped w/Cement 867.00 875.00 0
1999-11-25 Perforation 845.00 861.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References