X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072106D20

Well Details

Well ID: 0404072106D20
Loading map...
Location: D2/06-21-040-07W4/0
Location Alias: D2/06-21-40-07 W4M
Location Alias 2: D2/06-21-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 6-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0155692
License Date: 1993-01-15
License Status: Suspension
Spud Date: 1993-01-27
Final Drill Date: 1993-01-30
Well Total Depth: 905.00 m
Surface Hole Latitude: 52.454743
Surface Hole Longitude: -110.954480

For data sources see[1][2]

Well History

Date Event
1993-01-15 Obtained License
1993-01-28 Direction Drilling Operation Performed - Deviate
1993-01-28 Surface Casing Operation Performed
1993-01-30 Finished Drilling
1993-01-30 Well Log Performed
1993-01-30 Well Mode changed to Drilled and Cased
1993-01-31 Production Casing Operation Performed
1993-01-31 Rig Released
1993-02-10 Well Log Performed
1993-02-17 Perforation Treatment Performed - Jet Perforation
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
1993-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-21 Perforation Treatment Performed - Cement Squeeze
1993-06-21 Perforation Treatment Performed - Jet Perforation
1993-06-24 Perforation Treatment Performed - Jet Perforation
1993-06-26 Perforation Treatment Performed - Cement Squeeze
1993-06-26 Perforation Treatment Performed - Jet Perforation
1993-06-27 Perforation Treatment Performed - Jet Perforation
2004-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-01 Well Fluid changed to Crude Oil
2008-05-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-28 403.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-17 Perforation 839.00 841.50 13
1993-06-21 Perforation 847.20 847.50 13
1993-06-21 Acid Treatment 847.20 847.50 0
1993-06-21 Cement Squeeze 839.00 841.50 0
1993-06-24 Perforation 839.00 841.50 13
1993-06-26 Perforation 847.20 847.50 13
1993-06-26 Cement Squeeze 839.00 847.50 0
1993-06-27 Perforation 839.00 841.50 13
2004-03-25 Packing Device Capped w/Cement 826.00 834.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7096 0.0 0.0 0.0
1994 8494 0.0 0.0 0.0
1995 8703 0.0 0.0 0.0
1996 8572 0.0 0.0 0.0
1997 2058 0.0 0.0 0.0
1998 7919 0.0 0.0 0.0
1999 8722 0.0 0.0 0.0
2000 8649 0.0 0.0 0.0
2001 2012 0.0 0.0 0.0
2002 192 0.0 0.0 0.0

For data sources see[6]

References