X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072111A00

Well Details

Well ID: 0404072111A00
Loading map...
Location: A0/11-21-040-07W4/0
Location Alias: A0/11-21-40-07 W4M
Location Alias 2: A0/11-21-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 11-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0155766
License Date: 1993-01-19
License Status: Issued
Spud Date: 1993-02-04
Final Drill Date: 1993-02-06
Well Total Depth: 913.00 m
Surface Hole Latitude: 52.455012
Surface Hole Longitude: -110.954584

For data sources see[1][2]

Well History

Date Event
1993-01-19 Obtained License
1993-02-05 Direction Drilling Operation Performed - Deviate
1993-02-05 Surface Casing Operation Performed
1993-02-06 Finished Drilling
1993-02-06 Well Mode changed to Drilled and Cased
1993-02-07 Production Casing Operation Performed
1993-02-07 Rig Released
1993-02-07 Well Log Performed
1993-02-18 Perforation Treatment Performed - Jet Perforation
1993-02-18 Well Log Performed
1993-02-19 Perforation Treatment Performed - Jet Perforation
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
1999-02-10 Well Fluid changed to Crude Oil
1999-02-10 Well Mode changed to Suspended
2004-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-03 Plug Back Performed
2004-02-03 Well Fluid changed to Crude Oil
2004-02-03 Well Mode changed to Abandoned Zone
2004-02-04 Perforation Treatment Performed - Jet Perforation
2004-03-02 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-05 336.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-18 Perforation 841.50 842.50 13
1993-02-18 Perforation 843.00 845.00 13
1993-02-19 Perforation 844.50 845.50 13
2004-02-03 Packing Device Capped w/Cement 824.00 832.00 0
2004-02-04 Perforation 691.00 693.00 23

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7122 0.0 0.0 0.0
1994 8671 0.0 0.0 0.0
1995 8410 0.0 0.0 0.0
1996 7949 0.0 0.0 0.0
1997 1966 0.0 0.0 0.0
1998 3413 0.0 0.0 0.0

For data sources see[6]

References