X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072112A00

Well Details

Well ID: 0404072112A00
Loading map...
Location: A0/12-21-040-07W4/0
Location Alias: A0/12-21-40-07 W4M
Location Alias 2: A0/12-21-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 12-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0121772
License Date: 1986-01-27
License Status: Amended
Spud Date: 1986-07-27
Final Drill Date: 1986-07-29
Well Total Depth: 969.00 m
Surface Hole Latitude: 52.457392
Surface Hole Longitude: -110.961276

For data sources see[1][2]

Well History

Date Event
1986-01-27 Obtained License
1986-07-28 Surface Casing Operation Performed
1986-07-29 Finished Drilling
1986-07-29 Well Log Performed
1986-07-29 Well Mode changed to Drilled and Cased
1986-07-30 Production Casing Operation Performed
1986-07-30 Rig Released
1986-08-03 Perforation Treatment Performed - Jet Perforation
1986-08-20 Well Began Production
1986-08-20 Well Fluid changed to Crude Oil
1986-08-20 Well Mode changed to Pumping
1989-03-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1993-04-22 Perforation Treatment Performed - Cement Squeeze
1993-04-25 Perforation Treatment Performed - Jet Perforation
1993-04-25 Well Log Performed
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Suspended
1993-11-10 Well Began Injection
1993-11-10 Well Fluid changed to Water
1993-11-10 Well Type changed to Disposal
1995-06-09 Perforation Treatment Performed - Cement Squeeze
1995-06-09 Plug Back Performed
1995-06-09 Well Fluid changed to Water
1995-06-09 Well Mode changed to Abandoned Zone
1995-06-09 Well Type changed to Disposal
1995-06-15 Perforation Treatment Performed - Open-Hole Completion
2001-10-16 Perforation Treatment Performed - Cement Squeeze
2001-10-16 Plug Back Performed
2001-10-19 Perforation Treatment Performed - Jet Perforation
2001-10-19 Well Fluid changed to Water
2001-10-19 Well Log Performed
2001-10-19 Well Mode changed to Suspended
2001-10-19 Well Type changed to Disposal
2001-10-24 Well Log Performed
2001-10-27 Well Fluid changed to Water
2001-10-27 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-08-03 Perforation 827.00 830.00 13
1989-03-11 Hydra Jet Perforation 830.00 832.00 0
1993-04-22 Cement Squeeze 827.00 832.00 0
1993-04-25 Perforation 860.00 867.00 13
1995-06-09 Cement Squeeze 860.00 867.00 0
1995-06-15 Open Hole/Barefoot Completion 871.20 969.00 0
2001-10-16 Cement Squeeze 872.00 969.00 0
2001-10-19 Perforation 838.00 868.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3096 0.0 0.0 0.0
1987 8634 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8463 0.0 0.0 0.0
1990 3926 0.0 0.0 0.0
1991 930 0.0 0.0 0.0
1992 6861 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References