X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072205B20

Well Details

Well ID: 0404072205B20
Loading map...
Location: B2/05-22-040-07W4/0
Location Alias: B2/05-22-40-07 W4M
Location Alias 2: B2/05-22-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 5-22-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0181768
License Date: 1995-11-01
License Status: Suspension
Spud Date: 1995-12-12
Final Drill Date: 1995-12-15
Well Total Depth: 941.00 m
Surface Hole Latitude: 52.450686
Surface Hole Longitude: -110.938065

For data sources see[1][2]

Well History

Date Event
1995-11-01 Obtained License
1995-12-13 Surface Casing Operation Performed
1995-12-14 Direction Drilling Operation Performed - Deviate
1995-12-15 Finished Drilling
1995-12-15 Well Log Performed
1995-12-15 Well Mode changed to Drilled and Cased
1995-12-16 Production Casing Operation Performed
1995-12-16 Rig Released
1995-12-21 Perforation Treatment Performed - Jet Perforation
1995-12-28 Well Log Performed
1995-12-30 Well Began Production
1995-12-30 Well Fluid changed to Crude Oil
1995-12-30 Well Mode changed to Pumping
1996-02-15 Perforation Treatment Performed - Cement Squeeze
1996-02-15 Perforation Treatment Performed - Jet Perforation
1996-02-18 Perforation Treatment Performed - Jet Perforation
2004-09-27 Perforation Treatment Performed - Jet Perforation
2004-09-27 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2004-09-27 Well Log Performed
2004-09-28 Perforation Treatment Performed - Jet Perforation
2008-05-01 Well Fluid changed to Crude Oil
2008-05-01 Well Mode changed to Suspended
2016-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-12-14 213.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-21 Perforation 874.00 876.00 13
1996-02-15 Perforation 884.00 885.00 13
1996-02-15 Cement Squeeze 874.00 885.00 0
1996-02-18 Perforation 874.00 876.00 13
2004-09-27 Packing Dev Cpd w/Res-Gyp Cem 869.00 872.00 0
2004-09-27 Perforation 859.80 861.00 17
2004-09-27 Perforation 862.00 863.00 17
2004-09-28 Perforation 859.00 862.50 17
2016-09-15 Packing Device Capped w/Cement 845.00 853.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 48 0.0 0.0 0.0
1996 8502 0.0 0.0 0.0
1997 8725 0.0 0.0 0.0
1998 8665 0.0 0.0 0.0
1999 8700 0.0 0.0 0.0
2000 8695 0.0 0.0 0.0
2001 8707 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 4341 0.0 0.0 0.0
2004 501 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-16 No Incident Encountered 0.00 0.00

For data sources see[7]

References