If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404072714C30 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.476143,"lon":-110.93334,"icon":""}]} |
Location: C3/14-27-040-07W4/0 | |
Location Alias: C3/14-27-40-07 W4M | |
Location Alias 2: C3/14-27-040-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 07 | |
Section: 27 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: SOC PROVOST 14-27-40-7 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0148779 | |
License Date: 1991-05-07 | |
License Status: Suspension | |
Spud Date: 1991-05-24 | |
Final Drill Date: 1991-05-26 | |
Well Total Depth: 895.00 m | |
Surface Hole Latitude: 52.476143 | |
Surface Hole Longitude: -110.933340 |
Date | Event |
---|---|
1991-05-07 | Obtained License |
1991-05-24 | Surface Casing Operation Performed |
1991-05-26 | Finished Drilling |
1991-05-26 | Well Log Performed |
1991-05-26 | Well Mode changed to Drilled and Cased |
1991-05-27 | Production Casing Operation Performed |
1991-05-27 | Rig Released |
1991-05-28 | Well Began Production |
1991-05-28 | Well Fluid changed to Crude Oil |
1991-05-28 | Well Mode changed to Pumping |
1991-05-29 | Perforation Treatment Performed - Jet Perforation |
2001-05-29 | Well Fluid changed to Crude Oil |
2001-05-29 | Well Mode changed to Suspended |
2003-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-13 | Plug Back Performed |
2003-07-13 | Well Fluid changed to Crude Oil |
2003-07-13 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-05-29 | Perforation | 830.00 | 832.00 | 13 |
2003-07-13 | Packing Device Capped w/Cement | 817.00 | 825.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 5067 | 0.0 | 0.0 | 0.0 |
1992 | 8663 | 0.0 | 0.0 | 0.0 |
1993 | 8643 | 0.0 | 0.0 | 0.0 |
1994 | 7904 | 0.0 | 0.0 | 0.0 |
1995 | 8633 | 0.0 | 0.0 | 0.0 |
1996 | 8497 | 0.0 | 0.0 | 0.0 |
1997 | 3660 | 0.0 | 0.0 | 0.0 |
1998 | 8685 | 0.0 | 0.0 | 0.0 |
1999 | 8700 | 0.0 | 0.0 | 0.0 |
2000 | 8375 | 0.0 | 0.0 | 0.0 |
2001 | 3101 | 0.0 | 0.0 | 0.0 |
For data sources see[5]