X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072815D00

Well Details

Well ID: 0404072815D00
Loading map...
Location: D0/15-28-040-07W4/0
Location Alias: D0/15-28-40-07 W4M
Location Alias 2: D0/15-28-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 28
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 15-28-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0124457
License Date: 1986-11-20
License Status: Suspension
Spud Date: 1986-12-03
Final Drill Date: 1986-12-04
Well Total Depth: 889.00 m
Surface Hole Latitude: 52.476949
Surface Hole Longitude: -110.948133

For data sources see[1][2]

Well History

Date Event
1986-11-20 Obtained License
1986-12-03 Surface Casing Operation Performed
1986-12-04 Finished Drilling
1986-12-04 Well Mode changed to Drilled and Cased
1986-12-05 Production Casing Operation Performed
1986-12-05 Rig Released
1986-12-05 Well Log Performed
1986-12-08 Perforation Treatment Performed - Jet Perforation
1986-12-08 Well Log Performed
1986-12-14 Well Began Production
1986-12-14 Well Fluid changed to Crude Oil
1986-12-14 Well Mode changed to Pumping
1988-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-05 Perforation Treatment Performed - Cement Squeeze
1988-05-05 Perforation Treatment Performed - Jet Perforation
1988-05-07 Perforation Treatment Performed - Jet Perforation
1988-11-07 Perforation Treatment Performed - Jet Perforation
2001-04-01 Well Fluid changed to Crude Oil
2001-04-01 Well Mode changed to Suspended
2003-07-15 Well Log Performed
2003-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-17 Plug Back Performed
2003-07-17 Well Fluid changed to Crude Oil
2003-07-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-08 Perforation 847.50 850.00 13
1988-05-05 Perforation 852.00 853.50 13
1988-05-05 Acid Treatment 847.50 853.50 0
1988-05-05 Cement Squeeze 847.50 853.50 0
1988-05-07 Perforation 845.50 848.00 13
1988-11-07 Perforation 848.00 849.00 13
2003-07-17 Packing Device Capped w/Cement 833.70 841.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 388 0.0 0.0 0.0
1987 8640 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8671 0.0 0.0 0.0
1990 8460 0.0 0.0 0.0
1991 5175 0.0 0.0 0.0
1992 8275 0.0 0.0 0.0
1993 8609 0.0 0.0 0.0
1994 8600 0.0 0.0 0.0
1995 8696 0.0 0.0 0.0
1996 5809 0.0 0.0 0.0
1997 7745 0.0 0.0 0.0
1998 8431 0.0 0.0 0.0
1999 8695 0.0 0.0 0.0
2000 8694 0.0 0.0 0.0
2001 2012 0.0 0.0 0.0

For data sources see[5]

References