X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404073301B30

Well Details

Well ID: 0404073301B30
Loading map...
Location: B3/01-33-040-07W4/0
Location Alias: B3/01-33-40-07 W4M
Location Alias 2: B3/01-33-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 1-33-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0154789
License Date: 1992-11-27
License Status: Suspension
Spud Date: 1993-01-06
Final Drill Date: 1993-01-08
Well Total Depth: 912.00 m
Surface Hole Latitude: 52.478374
Surface Hole Longitude: -110.944049

For data sources see[1][2]

Well History

Date Event
1992-11-27 Obtained License
1993-01-06 Surface Casing Operation Performed
1993-01-07 Direction Drilling Operation Performed - Deviate
1993-01-08 Finished Drilling
1993-01-08 Well Log Performed
1993-01-08 Well Mode changed to Drilled and Cased
1993-01-09 Production Casing Operation Performed
1993-01-09 Rig Released
1993-01-13 Perforation Treatment Performed - Jet Perforation
1993-01-17 Well Began Production
1993-01-17 Well Fluid changed to Crude Oil
1993-01-17 Well Mode changed to Pumping
1993-01-27 Well Log Performed
2001-03-21 Well Fluid changed to Crude Oil
2001-03-21 Well Mode changed to Suspended
2004-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-04 Perforation Treatment Performed - Jet Perforation
2006-08-04 Well Log Performed
2006-08-29 Well Fluid changed to Crude Oil
2006-08-29 Well Mode changed to Pumping
2011-03-25 Well Fluid changed to Crude Oil
2011-03-25 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-07 408.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-13 Perforation 839.70 841.70 13
2004-04-13 Packing Device Capped w/Cement 826.90 834.90 0
2006-08-04 Perforation 839.70 841.70 13
2006-08-04 Perforation 838.00 839.70 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 8176 0.0 0.0 0.0
1994 8618 0.0 0.0 0.0
1995 8685 0.0 0.0 0.0
1996 8676 0.0 0.0 0.0
1997 8728 0.0 0.0 0.0
1998 8698 0.0 0.0 0.0
1999 8692 0.0 0.0 0.0
2000 8638 0.0 0.0 0.0
2001 1844 0.0 0.0 0.0
2006 2887 0.0 0.0 0.0
2007 8153 0.0 0.0 0.0
2008 6008 0.0 0.0 0.0
2010 743 0.0 0.0 0.0
2011 285 0.0 0.0 0.0

For data sources see[6]

References