X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404073309020

Well Details

Well ID: 0404073309020
Loading map...
Location: 02/09-33-040-07W4/0
Location Alias: 02/09-33-40-07 W4M
Location Alias 2: 02/09-33-040-07 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 9-33-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0114768
License Date: 1985-05-22
License Status: Amended
Spud Date: 1986-02-19
Final Drill Date: 1986-02-21
Well Total Depth: 883.00 m
Surface Hole Latitude: 52.485809
Surface Hole Longitude: -110.942243

For data sources see[1][2]

Well History

Date Event
1985-05-22 Obtained License
1986-02-19 Surface Casing Operation Performed
1986-02-21 Finished Drilling
1986-02-21 Well Log Performed
1986-02-21 Well Mode changed to Drilled and Cased
1986-02-22 Production Casing Operation Performed
1986-02-22 Rig Released
1986-02-25 Well Log Performed
1986-02-27 Perforation Treatment Performed - Jet Perforation
1986-03-01 Well Began Production
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Pumping
1987-02-08 Perforation Treatment Performed - Jet Perforation
1987-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-09 Perforation Treatment Performed - Cement Squeeze
1987-02-10 Perforation Treatment Performed - Jet Perforation
1991-10-03 Perforation Treatment Performed - Cement Squeeze
1991-10-05 Perforation Treatment Performed - Jet Perforation
1991-10-05 Well Log Performed
1991-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-06 Well Began Injection
1991-10-06 Well Fluid changed to Water
1991-10-06 Well Type changed to Disposal
2001-03-23 Perforation Treatment Performed - Jet Perforation
2001-03-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-27 Perforation 831.00 833.00 13
2001-03-23 Perforation 849.00 855.00 17
1987-02-08 Perforation 841.00 842.00 13
1987-02-09 Acid Treatment 831.00 842.00 0
1987-02-09 Cement Squeeze 831.00 842.00 0
1987-02-10 Perforation 831.00 833.00 13
1991-10-03 Cement Squeeze 831.00 833.00 0
1991-10-05 Perforation 855.00 870.00 13
1991-10-06 Acid Treatment 855.00 870.00 0
2001-03-23 Perforation 870.00 874.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 7210 0.0 0.0 0.0
1987 8556 0.0 0.0 0.0
1988 4271 0.0 0.0 0.0
1989 6070 0.0 0.0 0.0
1990 3253 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References