If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404082201030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.449203,"lon":-111.065155,"icon":""}]} |
Location: 03/01-22-040-08W4/0 | |
Location Alias: 03/01-22-40-08 W4M | |
Location Alias 2: 03/01-22-040-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 08 | |
Section: 22 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CLEO ENERGY PROVOST 1-22-40-8 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0120286 | |
License Date: 1985-12-12 | |
License Status: Amended | |
Spud Date: 1985-12-17 | |
Final Drill Date: 1985-12-20 | |
Well Total Depth: 887.00 m | |
Surface Hole Latitude: 52.449203 | |
Surface Hole Longitude: -111.065155 |
Date | Event |
---|---|
1985-12-12 | Obtained License |
1985-12-18 | Surface Casing Operation Performed |
1985-12-20 | Finished Drilling |
1985-12-20 | Well Mode changed to Drilled and Cased |
1985-12-21 | Production Casing Operation Performed |
1985-12-21 | Rig Released |
1986-01-05 | Well Log Performed |
1986-01-06 | Perforation Treatment Performed - Jet Perforation |
1986-01-06 | Well Log Performed |
1986-02-01 | Well Began Production |
1986-02-01 | Well Fluid changed to Crude Oil |
1986-02-01 | Well Mode changed to Pumping |
2000-09-20 | Perforation Treatment Performed - Cement Squeeze |
2000-09-24 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-01-06 | Perforation | 883.50 | 885.00 | 13 |
2000-09-20 | Cement Squeeze | 883.50 | 885.00 | 0 |
2000-09-24 | Perforation | 880.50 | 881.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 6079 | 0.0 | 0.0 | 0.0 |
1987 | 6905 | 0.0 | 0.0 | 0.0 |
1988 | 8450 | 0.0 | 0.0 | 0.0 |
1989 | 8245 | 0.0 | 0.0 | 0.0 |
1990 | 8272 | 0.0 | 0.0 | 0.0 |
1991 | 7680 | 0.0 | 0.0 | 0.0 |
1992 | 8128 | 0.0 | 0.0 | 0.0 |
1993 | 8433 | 0.0 | 0.0 | 0.0 |
1994 | 8246 | 0.0 | 0.0 | 0.0 |
1995 | 7993 | 0.0 | 0.0 | 0.0 |
1996 | 8470 | 0.0 | 0.0 | 0.0 |
1997 | 8635 | 0.0 | 0.0 | 0.0 |
1998 | 3738 | 0.0 | 0.0 | 0.0 |
1999 | 8619 | 0.0 | 0.0 | 0.0 |
2000 | 8421 | 0.0 | 0.0 | 0.0 |
2001 | 8283 | 0.0 | 0.0 | 0.0 |
2002 | 8431 | 0.0 | 0.0 | 0.0 |
2003 | 8500 | 0.0 | 0.0 | 0.0 |
2004 | 8544 | 0.0 | 0.0 | 0.0 |
2005 | 8523 | 0.0 | 0.0 | 0.0 |
2006 | 8417 | 0.0 | 0.0 | 0.0 |
2007 | 8460 | 0.0 | 0.0 | 0.0 |
2008 | 8130 | 0.0 | 0.0 | 0.0 |
2009 | 5577 | 0.0 | 0.0 | 0.0 |
2010 | 5735 | 0.0 | 0.0 | 0.0 |
2011 | 8244 | 0.0 | 0.0 | 0.0 |
2012 | 8287 | 0.0 | 0.0 | 0.0 |
2013 | 8272 | 0.0 | 0.0 | 0.0 |
2014 | 8087 | 0.0 | 0.0 | 0.0 |
2015 | 5186 | 0.0 | 0.0 | 0.0 |
2016 | 5104 | 0.0 | 0.0 | 0.0 |
2017 | 8412 | 0.0 | 0.0 | 0.0 |
2018 | 5340 | 0.0 | 0.0 | 0.0 |
2020 | 228 | 0.0 | 0.0 | 0.0 |
For data sources see[5]