X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082203020

Well Details

Well ID: 0404082203020
Loading map...
Location: 02/03-22-040-08W4/0
Location Alias: 02/03-22-40-08 W4M
Location Alias 2: 02/03-22-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 3-22-40-8
Operator Name: Cleo Energy Corp.
License Number: 0120280
License Date: 1985-12-12
License Status: Abandoned
Spud Date: 1986-01-02
Final Drill Date: 1986-01-04
Well Total Depth: 905.30 m
Surface Hole Latitude: 52.449191
Surface Hole Longitude: -111.074050

For data sources see[1][2]

Well History

Date Event
1985-12-12 Obtained License
1986-01-03 Surface Casing Operation Performed
1986-01-04 Finished Drilling
1986-01-04 Well Mode changed to Drilled and Cased
1986-01-05 Production Casing Operation Performed
1986-01-05 Rig Released
1986-02-01 Well Log Performed
1986-02-02 Well Log Performed
1986-02-03 Perforation Treatment Performed - Open-Hole Completion
1986-03-01 Well Began Production
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Pumping
1987-05-07 Well Log Performed
1987-05-15 Perforation Treatment Performed - Open-Hole Completion
1987-05-16 Liner Casing Operation Performed
1987-05-16 Perforation Treatment Performed - Cement Squeeze
1987-05-16 Perforation Treatment Performed - Jet Perforation
1987-05-20 Perforation Treatment Performed - Jet Perforation
1987-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-09-17 Plug Back Performed
1987-09-17 Well Fluid changed to Crude Oil
1987-09-17 Well Mode changed to Abandoned
1987-10-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-03 Open Hole/Barefoot Completion 893.80 897.00 0
1987-05-15 Open Hole/Barefoot Completion 897.00 905.30 0
1987-05-16 Cement Squeeze 863.30 905.30 0
1987-05-16 Perforation 893.80 897.00 13
1987-05-16 Cement Squeeze 893.80 897.00 0
1987-05-20 Perforation 895.50 898.50 13
1987-09-17 Packing Device Capped w/Cement 856.00 864.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5576 0.0 0.0 0.0
1987 1198 0.0 0.0 0.0

For data sources see[5]

References