X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082208000

Well Details

Well ID: 0404082208000
Loading map...
Location: 00/08-22-040-08W4/0
Location Alias: 00/08-22-40-08 W4M
Location Alias 2: 00/08-22-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 22
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 8-22-40-8
Operator Name: Cleo Energy Corp.
License Number: 0100751
License Date: 1983-02-24
License Status: Suspension
Spud Date: 1983-02-25
Final Drill Date: 1983-03-05
Well Total Depth: 975.00 m
Surface Hole Latitude: 52.452322
Surface Hole Longitude: -111.061257

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-24 Obtained License
1983-03-05 Finished Drilling
1983-03-05 Production Casing Operation Performed
1983-03-05 Well Mode changed to Drilled and Cased
1983-03-15 Perforation Treatment Performed - Jet Perforation
1983-03-23 Perforation Treatment Performed - Cement Squeeze
1983-03-24 Perforation Treatment Performed - Jet Perforation
1983-04-01 Well Began Production
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Pumping
1983-08-15 Well Fluid changed to Crude Oil
1983-08-15 Well Mode changed to Suspended
1983-10-01 Well Fluid changed to Crude Oil
1983-10-01 Well Mode changed to Pumping
1998-10-19 Perforation Treatment Performed - Cement Squeeze
1998-10-31 Perforation Treatment Performed - Jet Perforation
1998-10-31 Well Log Performed
1998-11-04 Well Fluid changed to Crude Oil
1998-11-04 Well Mode changed to Pumping
2006-09-25 Well Log Performed
2006-09-26 Perforation Treatment Performed - Jet Perforation
2006-09-26 Well Log Performed
2011-06-14 Well Fluid changed to Crude Oil
2011-06-14 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-15 Perforation 882.00 887.00 13
1983-03-23 Cement Squeeze 882.00 887.00 0
1983-03-24 Perforation 887.00 891.00 13
1998-10-19 Cement Squeeze 887.00 891.00 0
1998-10-31 Perforation 882.50 884.00 14
2006-09-26 Perforation 893.00 895.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3529 0.0 0.0 0.0
1984 7921 0.0 0.0 0.0
1985 7403 0.0 0.0 0.0
1986 5699 0.0 0.0 0.0
1987 8131 0.0 0.0 0.0
1988 8464 0.0 0.0 0.0
1989 8371 0.0 0.0 0.0
1990 8546 0.0 0.0 0.0
1991 8009 0.0 0.0 0.0
1992 8208 0.0 0.0 0.0
1993 8387 0.0 0.0 0.0
1994 8001 0.0 0.0 0.0
1995 7830 0.0 0.0 0.0
1996 8489 0.0 0.0 0.0
1997 8582 0.0 0.0 0.0
1998 8138 0.0 0.0 0.0
1999 8656 0.0 0.0 0.0
2000 8615 0.0 0.0 0.0
2001 8422 0.0 0.0 0.0
2002 8543 0.0 0.0 0.0
2003 8432 0.0 0.0 0.0
2004 8545 0.0 0.0 0.0
2005 8553 0.0 0.0 0.0
2006 8428 0.0 0.0 0.0
2007 8569 0.0 0.0 0.0
2008 8503 0.0 0.0 0.0
2009 7973 0.0 0.0 0.0
2010 2796 0.0 0.0 0.0
2011 41 0.0 0.0 0.0

For data sources see[5]

References