X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082605020

Well Details

Well ID: 0404082605020
Loading map...
Location: 02/05-26-040-08W4/0
Location Alias: 02/05-26-40-08 W4M
Location Alias 2: 02/05-26-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 5-26-40-8
Operator Name: Cleo Energy Corp.
License Number: 0161716
License Date: 1993-10-21
License Status: Suspension
Spud Date: 1993-11-19
Final Drill Date: 1993-11-23
Well Total Depth: 984.00 m
Surface Hole Latitude: 52.466584
Surface Hole Longitude: -111.054105

For data sources see[1][2]

Well History

Date Event
1993-10-21 Obtained License
1993-11-20 Surface Casing Operation Performed
1993-11-21 Direction Drilling Operation Performed - Deviate
1993-11-23 Finished Drilling
1993-11-23 Well Log Performed
1993-11-23 Well Mode changed to Drilled and Cased
1993-11-24 Production Casing Operation Performed
1993-11-24 Rig Released
1993-12-03 Well Log Performed
1993-12-13 Perforation Treatment Performed - Jet Perforation
1993-12-13 Well Log Performed
1993-12-18 Well Began Production
1993-12-18 Well Fluid changed to Crude Oil
1993-12-18 Well Mode changed to Pumping
1997-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-29 Perforation Treatment Performed - Cement Squeeze
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-04 Well Log Performed
2003-01-01 Well Fluid changed to Crude Oil
2003-01-01 Well Mode changed to Suspended
2003-02-10 Well Fluid changed to Crude Oil
2003-02-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-11-21 203.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-13 Perforation 909.50 911.50 13
1993-12-13 Perforation 907.00 908.00 13
1997-03-29 Acid Treatment 907.00 911.50 0
1997-03-29 Cement Squeeze 907.00 911.50 0
1997-04-03 Perforation 909.50 911.50 17
1997-04-03 Perforation 907.00 908.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 333 0.0 0.0 0.0
1994 8475 0.0 0.0 0.0
1995 8450 0.0 0.0 0.0
1996 8519 0.0 0.0 0.0
1997 8210 0.0 0.0 0.0
1998 8580 0.0 0.0 0.0
1999 8524 0.0 0.0 0.0
2000 8180 0.0 0.0 0.0
2001 5095 0.0 0.0 0.0
2003 7125 0.0 0.0 0.0
2004 8324 0.0 0.0 0.0
2005 6974 0.0 0.0 0.0
2006 6921 0.0 0.0 0.0
2007 8062 0.0 0.0 0.0
2008 8181 0.0 0.0 0.0
2009 8363 0.0 0.0 0.0
2010 8002 0.0 0.0 0.0
2011 8390 0.0 0.0 0.0
2012 8645 0.0 0.0 0.0
2013 8350 0.0 0.0 0.0
2014 8375 0.0 0.0 0.0
2015 8378 0.0 0.0 0.0
2016 4813 0.0 0.0 0.0
2017 509 0.0 0.0 0.0

For data sources see[6]

References