X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082606020

Well Details

Well ID: 0404082606020
Loading map...
Location: 02/06-26-040-08W4/0
Location Alias: 02/06-26-40-08 W4M
Location Alias 2: 02/06-26-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 6-26-40-8
Operator Name: Cleo Energy Corp.
License Number: 0146131
License Date: 1990-11-01
License Status: Suspension
Spud Date: 1990-12-10
Final Drill Date: 1990-12-14
Well Total Depth: 948.00 m
Surface Hole Latitude: 52.471507
Surface Hole Longitude: -111.053085

For data sources see[1][2]

Well History

Date Event
1990-11-01 Obtained License
1990-12-11 Surface Casing Operation Performed
1990-12-12 Direction Drilling Operation Performed - Deviate
1990-12-14 Finished Drilling
1990-12-14 Well Mode changed to Drilled and Cased
1990-12-15 Production Casing Operation Performed
1990-12-15 Well Log Performed
1990-12-16 Rig Released
1991-01-05 Perforation Treatment Performed - Jet Perforation
1991-01-05 Well Log Performed
1991-01-07 Perforation Treatment Performed - Jet Perforation
1991-01-07 Well Log Performed
1991-01-22 Well Log Performed
1991-02-07 Well Began Production
1991-02-07 Well Fluid changed to Crude Oil
1991-02-07 Well Mode changed to Pumping
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Suspended
1993-07-05 Well Fluid changed to Crude Oil
1993-07-05 Well Mode changed to Pumping
1997-04-15 Perforation Treatment Performed - Cement Squeeze
1997-04-19 Perforation Treatment Performed - Jet Perforation
1997-04-19 Well Log Performed
2001-02-01 Well Fluid changed to Crude Oil
2001-02-01 Well Mode changed to Suspended
2007-10-02 Perforation Treatment Performed - Jet Perforation
2007-10-02 Well Log Performed
2007-10-04 Well Log Performed
2007-10-11 Well Fluid changed to Crude Oil
2007-10-11 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-12 380.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-05 Perforation 917.50 922.50 13
1991-01-07 Perforation 922.50 924.00 13
1997-04-15 Cement Squeeze 917.50 924.00 0
1997-04-19 Perforation 916.50 920.50 17
1997-04-19 Perforation 921.00 922.00 17
2007-10-02 Perforation 913.50 914.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 3962 0.0 0.0 0.0
1993 4116 0.0 0.0 0.0
1994 8595 0.0 0.0 0.0
1995 8366 0.0 0.0 0.0
1996 8398 0.0 0.0 0.0
1997 6737 0.0 0.0 0.0
1998 8592 0.0 0.0 0.0
1999 8167 0.0 0.0 0.0
2007 1932 0.0 0.0 0.0
2008 6975 0.0 0.0 0.0
2009 8525 0.0 0.0 0.0
2010 7670 0.0 0.0 0.0
2011 8550 0.0 0.0 0.0
2012 8626 0.0 0.0 0.0
2013 8404 0.0 0.0 0.0
2014 8301 0.0 0.0 0.0
2015 7863 0.0 0.0 0.0
2016 8346 0.0 0.0 0.0
2017 8538 0.0 0.0 0.0
2018 4929 0.0 0.0 0.0

For data sources see[6]

References