If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404101312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.443141,"lon":-111.307907,"icon":""}]} |
Location: 00/12-13-040-10W4/0 | |
Location Alias: 00/12-13-40-10 W4M | |
Location Alias 2: 00/12-13-040-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 10 | |
Section: 13 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: 1994450AB PROVOST 12-13-40-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0395145 | |
License Date: 2008-03-05 | |
License Status: RecCertified | |
Spud Date: 2008-05-26 | |
Final Drill Date: 2008-05-31 | |
Well Total Depth: 1447.00 m | |
Surface Hole Latitude: 52.443141 | |
Surface Hole Longitude: -111.307907 |
Date | Event |
---|---|
2008-03-05 | Obtained License |
2008-05-27 | Surface Casing Operation Performed |
2008-05-28 | Direction Drilling Operation Performed - Deviate |
2008-05-29 | Direction Drilling Operation Performed - Horizontal |
2008-05-29 | Well Log Performed |
2008-05-30 | Intermediate Casing Operation Performed |
2008-05-31 | Finished Drilling |
2008-05-31 | Well Log Performed |
2008-05-31 | Well Mode changed to Drilled and Cased |
2008-06-01 | Liner Casing Operation Performed |
2008-06-01 | Perforation Treatment Performed - Slotted Liner or Casing |
2008-06-01 | Rig Released |
2008-09-12 | Well Began Production |
2008-09-12 | Well Fluid changed to Crude Oil |
2008-09-12 | Well Mode changed to Pumping |
2011-06-04 | Perforation Treatment Performed - Jet Perforation |
2011-06-04 | Well Log Performed |
2011-06-05 | Perforation Treatment Performed - Jet Perforation |
2012-04-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-16 | Plug Back Performed |
2012-04-16 | Well Fluid changed to Crude Oil |
2012-04-16 | Well Mode changed to Abandoned Zone |
2012-08-16 | Well Abandoned |
2012-08-16 | Well Fluid changed to Crude Oil |
2012-08-16 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-05-28 | 491.80 | Deviate (5 - 79 degrees) |
2008-05-29 | 1034.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-06-01 | Slotted Liner | 1114.00 | 1447.00 | 0 |
2011-06-04 | Perforation | 1278.00 | 1281.00 | 20 |
2011-06-04 | Perforation | 1259.00 | 1262.00 | 20 |
2011-06-04 | Perforation | 1242.00 | 1245.00 | 20 |
2011-06-05 | Perforation | 1211.00 | 1214.00 | 20 |
2011-06-05 | Perforation | 1136.00 | 1139.00 | 20 |
2012-04-16 | Packing Device Capped w/Cement | 1024.50 | 1033.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 264 | 0.0 | 0.0 | 0.0 |
2009 | 600 | 0.0 | 0.0 | 0.0 |
2010 | 1728 | 0.0 | 0.0 | 0.0 |
2011 | 49 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]