If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404101605C02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.440787,"lon":-111.395115,"icon":""}]} |
Location: C0/05-16-040-10W4/2 | |
Location Alias: C0/05-16-40-10 W4M | |
Location Alias 2: C0/05-16-040-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 10 | |
Section: 16 | |
County/Municipality: Flagstaff County | |
Well Name: 1994450AB PROVOST 5-16-40-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0129574 | |
License Date: 1987-10-23 | |
License Status: Suspension | |
Spud Date: 1987-11-23 | |
Final Drill Date: 1987-11-26 | |
Well Total Depth: 936.00 m | |
Surface Hole Latitude: 52.440787 | |
Surface Hole Longitude: -111.395115 |
Date | Event |
---|---|
1987-10-23 | Obtained License |
1987-11-24 | Surface Casing Operation Performed |
1987-11-26 | Finished Drilling |
1987-11-26 | Well Log Performed |
1987-11-26 | Well Mode changed to Drilled and Cased |
1987-11-27 | Production Casing Operation Performed |
1987-11-27 | Rig Released |
1987-12-06 | Perforation Treatment Performed - Jet Perforation |
2008-05-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-05-10 | Perforation Treatment Performed - Jet Perforation |
2008-05-10 | Well Log Performed |
2011-10-05 | Well Began Production |
2011-10-05 | Well Fluid changed to Gas |
2011-10-05 | Well Mode changed to Flowing |
2015-07-27 | Well Fluid changed to Gas |
2015-07-27 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-12-06 | Perforation | 892.00 | 893.00 | 13 |
2008-05-10 | Packing Device Capped w/Cement | 883.00 | 891.00 | 0 |
2008-05-10 | Perforation | 747.00 | 751.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1935 | 0.0 | 0.0 | 0.0 |
2012 | 8443 | 0.0 | 0.0 | 0.0 |
2013 | 7688 | 0.0 | 0.0 | 0.0 |
2014 | 8346 | 0.0 | 0.0 | 0.0 |
2015 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]