If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404102304080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.449155,"lon":-111.350244,"icon":""}]} |
Location: 08/04-23-040-10W4/0 | |
Location Alias: 08/04-23-40-10 W4M | |
Location Alias 2: 08/04-23-040-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 10 | |
Section: 23 | |
County/Municipality: Flagstaff County | |
Well Name: 1994450AB PROVOST 4-23-40-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0430699 | |
License Date: 2011-01-26 | |
License Status: Issued | |
Spud Date: 2011-02-10 | |
Final Drill Date: 2011-02-15 | |
Well Total Depth: 1242.80 m | |
Surface Hole Latitude: 52.449155 | |
Surface Hole Longitude: -111.350244 |
Date | Event |
---|---|
2011-01-26 | Obtained License |
2011-02-11 | Surface Casing Operation Performed |
2011-02-12 | Direction Drilling Operation Performed - Deviate |
2011-02-12 | Well Log Performed |
2011-02-14 | Intermediate Casing Operation Performed |
2011-02-15 | Direction Drilling Operation Performed - Horizontal |
2011-02-15 | Finished Drilling |
2011-02-15 | Well Mode changed to Drilled and Cased |
2011-02-16 | Liner Casing Operation Performed |
2011-02-16 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-02-18 | Rig Released |
2011-02-22 | Well Log Performed |
2011-03-23 | Well Began Production |
2011-03-23 | Well Fluid changed to Crude Oil |
2011-03-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-12 | 691.00 | Deviate (5 - 79 degrees) |
2011-02-15 | 1058.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-16 | Slotted Liner | 1039.30 | 1240.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6702 | 0.0 | 0.0 | 0.0 |
2012 | 7565 | 0.0 | 0.0 | 0.0 |
2013 | 8167 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8250 | 0.0 | 0.0 | 0.0 |
2017 | 8565 | 0.0 | 0.0 | 0.0 |
2018 | 2248 | 0.0 | 0.0 | 0.0 |
2019 | 8745 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[6]