If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404102812032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.469929,"lon":-111.394013,"icon":""}]} |
Location: 03/12-28-040-10W4/2 | |
Location Alias: 03/12-28-40-10 W4M | |
Location Alias 2: 03/12-28-040-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 10 | |
Section: 28 | |
County/Municipality: Flagstaff County | |
Well Name: 1994450AB PROVOST 12-28-40-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0310226 | |
License Date: 2004-06-14 | |
License Status: Suspension | |
Spud Date: 2004-06-29 | |
Final Drill Date: 2004-07-03 | |
Well Total Depth: 948.00 m | |
Surface Hole Latitude: 52.469929 | |
Surface Hole Longitude: -111.394013 |
Date | Event |
---|---|
2004-06-14 | Obtained License |
2004-06-30 | Surface Casing Operation Performed |
2004-07-01 | Direction Drilling Operation Performed - Deviate |
2004-07-03 | Finished Drilling |
2004-07-03 | Well Log Performed |
2004-07-03 | Well Mode changed to Drilled and Cased |
2004-07-04 | Production Casing Operation Performed |
2004-07-04 | Rig Released |
2004-08-10 | Perforation Treatment Performed - Jet Perforation |
2004-08-10 | Well Log Performed |
2005-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-12-20 | Perforation Treatment Performed - Jet Perforation |
2005-12-20 | Plug Back Performed |
2005-12-23 | Well Began Production |
2005-12-23 | Well Fluid changed to Gas |
2005-12-23 | Well Mode changed to Flowing |
2009-03-09 | Well Fluid changed to Gas |
2009-03-09 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-07-01 | 300.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-10 | Perforation | 907.50 | 908.50 | 17 |
2005-12-20 | Packing Device Capped w/Cement | 892.00 | 900.00 | 0 |
2005-12-20 | Perforation | 782.00 | 783.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 216 | 0.0 | 0.0 | 0.0 |
2006 | 136 | 0.0 | 0.0 | 0.0 |
For data sources see[6]