If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404113204020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.481015,"lon":-111.563036,"icon":""}]} |
Location: 02/04-32-040-11W4/0 | |
Location Alias: 02/04-32-40-11 W4M | |
Location Alias 2: 02/04-32-040-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 11 | |
Section: 32 | |
County/Municipality: Flagstaff County | |
Well Name: 1994450AB PROVOST 4-32-40-11 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0140188 | |
License Date: 1989-06-20 | |
License Status: Suspension | |
Spud Date: 1989-06-26 | |
Final Drill Date: 1989-06-29 | |
Well Total Depth: 977.00 m | |
Surface Hole Latitude: 52.481015 | |
Surface Hole Longitude: -111.563036 |
Date | Event |
---|---|
1989-06-20 | Obtained License |
1989-06-27 | Surface Casing Operation Performed |
1989-06-29 | Finished Drilling |
1989-06-29 | Well Log Performed |
1989-06-29 | Well Mode changed to Drilled and Cased |
1989-06-30 | Production Casing Operation Performed |
1989-06-30 | Rig Released |
1989-08-03 | Well Log Performed |
1989-08-09 | Perforation Treatment Performed - Jet Perforation |
1989-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-18 | Well Began Production |
1989-09-18 | Well Fluid changed to Crude Oil |
1989-09-18 | Well Mode changed to Pumping |
2003-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-11-19 | Well Fluid changed to Crude Oil |
2008-11-19 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-08-09 | Perforation | 945.50 | 946.00 | 7 |
1989-08-10 | Acid Treatment | 945.50 | 946.00 | 0 |
2003-08-21 | Packing Device Capped w/Cement | 932.50 | 940.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 2031 | 0.0 | 0.0 | 0.0 |
1990 | 7767 | 0.0 | 0.0 | 0.0 |
1991 | 4745 | 0.0 | 0.0 | 0.0 |
1992 | 8050 | 0.0 | 0.0 | 0.0 |
1993 | 8472 | 0.0 | 0.0 | 0.0 |
1994 | 8608 | 0.0 | 0.0 | 0.0 |
1995 | 7853 | 0.0 | 0.0 | 0.0 |
1996 | 8215 | 0.0 | 0.0 | 0.0 |
1997 | 7931 | 0.0 | 0.0 | 0.0 |
1998 | 8594 | 0.0 | 0.0 | 0.0 |
1999 | 8571 | 0.0 | 0.0 | 0.0 |
2000 | 5976 | 0.0 | 0.0 | 0.0 |
For data sources see[5]