If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404120303020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.407639,"lon":-111.650577,"icon":""}]} |
Location: 02/03-03-040-12W4/0 | |
Location Alias: 02/03-03-40-12 W4M | |
Location Alias 2: 02/03-03-040-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Flagstaff County | |
Well Name: 1994450AB PROVOST 3-3-40-12 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0158295 | |
License Date: 1993-05-13 | |
License Status: Abandoned | |
Spud Date: 1993-06-13 | |
Final Drill Date: 1993-06-16 | |
Well Total Depth: 1020.00 m | |
Surface Hole Latitude: 52.407639 | |
Surface Hole Longitude: -111.650577 |
Date | Event |
---|---|
1993-05-13 | Obtained License |
1993-06-14 | Surface Casing Operation Performed |
1993-06-16 | Drill Stem Test Performed |
1993-06-16 | Finished Drilling |
1993-06-16 | Well Log Performed |
1993-06-16 | Well Mode changed to Drilled and Cased |
1993-06-17 | Production Casing Operation Performed |
1993-06-17 | Rig Released |
1993-07-16 | Perforation Treatment Performed - Jet Perforation |
1994-11-21 | Well Began Production |
1994-11-21 | Well Fluid changed to Gas |
1994-11-21 | Well Mode changed to Flowing |
2003-08-05 | Perforation Treatment Performed - Cement Squeeze |
2003-08-05 | Plug Back Performed |
2003-08-05 | Well Fluid changed to Gas |
2003-08-05 | Well Mode changed to Abandoned Zone |
2003-08-08 | Perforation Treatment Performed - Jet Perforation |
2003-08-08 | Well Log Performed |
2006-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-01-17 | Plug Back Performed |
2006-01-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-12-15 | Plug Back Performed |
2014-12-15 | Well Log Performed |
2014-12-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-07-16 | Perforation | 832.00 | 834.50 | 13 |
2003-08-05 | Cement Squeeze | 832.00 | 834.50 | 0 |
2003-08-08 | Perforation | 953.50 | 954.50 | 20 |
2006-01-17 | Packing Device Capped w/Cement | 941.50 | 949.50 | 0 |
2006-01-18 | Packing Device Capped w/Cement | 869.00 | 877.00 | 0 |
2006-01-18 | Packing Device Capped w/Cement | 848.00 | 856.00 | 0 |
2014-12-15 | Packing Device Capped w/Cement | 819.00 | 828.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 904 | 0.0 | 0.0 | 0.0 |
1995 | 8663 | 0.0 | 0.0 | 0.0 |
1996 | 8700 | 0.0 | 0.0 | 0.0 |
1997 | 8662 | 0.0 | 0.0 | 0.0 |
1998 | 8707 | 0.0 | 0.0 | 0.0 |
1999 | 8743 | 0.0 | 0.0 | 0.0 |
2000 | 8774 | 0.0 | 0.0 | 0.0 |
2001 | 5494 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-12-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]