If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404122911020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.473714,"lon":-111.702918,"icon":""}]} |
| Location: 02/11-29-040-12W4/0 | |
| Location Alias: 02/11-29-40-12 W4M | |
| Location Alias 2: 02/11-29-040-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 29 | |
| County/Municipality: Flagstaff County | |
| Well Name: 1994450AB PROVOST 11-29-40-12 | |
| Operator Name: AlphaBow Energy Ltd. | |
| License Number: 0404853 | |
| License Date: 2008-11-27 | |
| License Status: Suspension | |
| Spud Date: 2008-12-31 | |
| Final Drill Date: 2009-01-05 | |
| Well Total Depth: 1013.00 m | |
| Surface Hole Latitude: 52.473714 | |
| Surface Hole Longitude: -111.702918 |
| Date | Event |
|---|---|
| 2008-11-27 | Obtained License |
| 2009-01-01 | Surface Casing Operation Performed |
| 2009-01-03 | Direction Drilling Operation Performed - Deviate |
| 2009-01-04 | Well Log Performed |
| 2009-01-05 | Finished Drilling |
| 2009-01-05 | Production Casing Operation Performed |
| 2009-01-05 | Well Mode changed to Drilled and Cased |
| 2009-01-06 | Rig Released |
| 2009-03-02 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-02 | Well Began Production |
| 2009-12-02 | Well Fluid changed to Crude Oil |
| 2009-12-02 | Well Mode changed to Pumping |
| 2012-07-13 | Well Fluid changed to Crude Oil |
| 2012-07-13 | Well Mode changed to Suspended |
| 2013-01-30 | Well Fluid changed to Crude Oil |
| 2013-01-30 | Well Mode changed to Pumping |
| 2016-04-01 | Well Fluid changed to Crude Oil |
| 2016-04-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-01-03 | 625.40 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-03-02 | Perforation | 978.60 | 980.60 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 703 | 0.0 | 0.0 | 0.0 |
| 2010 | 6817 | 0.0 | 0.0 | 0.0 |
| 2011 | 1330 | 0.0 | 0.0 | 0.0 |
| 2013 | 630 | 0.0 | 0.0 | 0.0 |
| 2014 | 3754 | 0.0 | 0.0 | 0.0 |
| 2015 | 2636 | 0.0 | 0.0 | 0.0 |
For data sources see[6]