If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404123104020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.479648,"lon":-111.729435,"icon":""}]} |
Location: 02/04-31-040-12W4/0 | |
Location Alias: 02/04-31-40-12 W4M | |
Location Alias 2: 02/04-31-040-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 12 | |
Section: 31 | |
County/Municipality: Flagstaff County | |
Well Name: PRED 102 ALLI 4-31-40-12 | |
Operator Name: Canadian Coyote Energy Ltd. | |
License Number: 0097880 | |
License Date: 1982-10-12 | |
License Status: Abandoned | |
Spud Date: 1982-10-26 | |
Final Drill Date: 1982-10-29 | |
Well Total Depth: 988.00 m | |
Surface Hole Latitude: 52.479648 | |
Surface Hole Longitude: -111.729435 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-12 | Obtained License |
1982-10-28 | Drill Stem Test Performed |
1982-10-29 | Finished Drilling |
1982-10-29 | Well Mode changed to Drilled and Cased |
1982-10-30 | Production Casing Operation Performed |
1982-10-30 | Well Log Performed |
1982-11-29 | Perforation Treatment Performed - Jet Perforation |
1982-12-03 | Well Began Production |
1982-12-03 | Well Fluid changed to Crude Oil |
1982-12-03 | Well Mode changed to Pumping |
1985-09-15 | Well Fluid changed to Crude Oil |
1985-09-15 | Well Mode changed to Suspended |
1994-09-22 | Well Log Performed |
1994-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-09-23 | Plug Back Performed |
1994-09-23 | Well Fluid changed to Crude Oil |
1994-09-23 | Well Log Performed |
1994-09-23 | Well Mode changed to Abandoned Zone |
1994-09-24 | Perforation Treatment Performed - Jet Perforation |
2004-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-07-02 | Plug Back Performed |
2017-08-18 | Well Log Performed |
2017-11-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-11-29 | Perforation | 959.20 | 960.20 | 0 |
1982-11-29 | Perforation | 960.70 | 961.50 | 0 |
1994-09-23 | Packing Device Capped w/Cement | 945.00 | 953.00 | 0 |
1994-09-24 | Perforation | 939.50 | 940.50 | 13 |
2004-07-02 | Packing Device Capped w/Cement | 910.70 | 924.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 672 | 0.0 | 0.0 | 0.0 |
1983 | 7744 | 0.0 | 0.0 | 0.0 |
1984 | 8638 | 0.0 | 0.0 | 0.0 |
1985 | 4530 | 0.0 | 0.0 | 0.0 |
For data sources see[5]