If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404131006C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.428104,"lon":-111.795523,"icon":""}]} |
Location: C0/06-10-040-13W4/0 | |
Location Alias: C0/06-10-40-13 W4M | |
Location Alias 2: C0/06-10-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 10 | |
County/Municipality: Flagstaff County | |
Well Name: PRED HZ HALKIRKE 6-10-40-13 | |
Operator Name: Canadian Coyote Energy Ltd. | |
License Number: 0150856 | |
License Date: 1991-12-03 | |
License Status: Abandoned | |
Spud Date: 1991-12-09 | |
Final Drill Date: 1991-12-15 | |
Well Total Depth: 1202.00 m | |
Surface Hole Latitude: 52.428104 | |
Surface Hole Longitude: -111.795523 |
Date | Event |
---|---|
1991-12-03 | Obtained License |
1991-12-10 | Surface Casing Operation Performed |
1991-12-11 | Direction Drilling Operation Performed - Horizontal |
1991-12-11 | Well Log Performed |
1991-12-13 | Well Log Performed |
1991-12-14 | Intermediate Casing Operation Performed |
1991-12-15 | Finished Drilling |
1991-12-15 | Well Log Performed |
1991-12-15 | Well Mode changed to Drilled and Cased |
1991-12-16 | Liner Casing Operation Performed |
1991-12-16 | Perforation Treatment Performed - Slotted Liner or Casing |
1991-12-16 | Rig Released |
1991-12-16 | Well Log Performed |
1992-01-08 | Well Began Production |
1992-01-08 | Well Fluid changed to Crude Oil |
1992-01-08 | Well Mode changed to Pumping |
1999-05-07 | Perforation Treatment Performed - Jet Perforation |
2000-04-30 | Well Fluid changed to Crude Oil |
2000-04-30 | Well Mode changed to Suspended |
2003-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-27 | Plug Back Performed |
2003-08-27 | Well Fluid changed to Crude Oil |
2003-08-27 | Well Mode changed to Abandoned Zone |
2003-10-27 | Well Abandoned |
2003-10-27 | Well Fluid changed to Crude Oil |
2003-10-27 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1991-12-11 | 787.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-12-16 | Slotted Liner | 1101.00 | 1202.00 | 0 |
1999-05-07 | Perforation | 1062.00 | 1072.00 | 14 |
2003-08-27 | Packing Device Capped w/Cement | 654.00 | 1050.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 8140 | 0.0 | 0.0 | 0.0 |
1993 | 8095 | 0.0 | 0.0 | 0.0 |
1994 | 7927 | 0.0 | 0.0 | 0.0 |
1995 | 4984 | 0.0 | 0.0 | 0.0 |
1996 | 8186 | 0.0 | 0.0 | 0.0 |
1997 | 5990 | 0.0 | 0.0 | 0.0 |
1998 | 8118 | 0.0 | 0.0 | 0.0 |
1999 | 1222 | 0.0 | 0.0 | 0.0 |
For data sources see[6]