If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404131403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.434921,"lon":-111.769702,"icon":""}]} |
Location: 00/03-14-040-13W4/0 | |
Location Alias: 00/03-14-40-13 W4M | |
Location Alias 2: 00/03-14-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 14 | |
County/Municipality: Flagstaff County | |
Well Name: PRED ET AL HALKIRKE 3-14-40-13 | |
Operator Name: Canadian Coyote Energy Ltd. | |
License Number: 0104729 | |
License Date: 1983-12-15 | |
License Status: Abandoned | |
Spud Date: 1984-01-16 | |
Final Drill Date: 1984-01-19 | |
Well Total Depth: 1029.00 m | |
Surface Hole Latitude: 52.434921 | |
Surface Hole Longitude: -111.769702 |
Date | Event |
---|---|
1983-12-15 | Obtained License |
1984-01-18 | Drill Stem Test Performed |
1984-01-19 | Finished Drilling |
1984-01-19 | Well Log Performed |
1984-01-19 | Well Mode changed to Drilled and Cased |
1984-01-20 | Production Casing Operation Performed |
1984-02-06 | Perforation Treatment Performed - Jet Perforation |
1984-02-06 | Well Log Performed |
1984-02-09 | Well Began Production |
1984-02-09 | Well Fluid changed to Crude Oil |
1984-02-09 | Well Mode changed to Pumping |
1999-07-09 | Well Fluid changed to Crude Oil |
1999-07-09 | Well Mode changed to Suspended |
2003-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-12 | Plug Back Performed |
2003-07-12 | Well Fluid changed to Crude Oil |
2003-07-12 | Well Mode changed to Abandoned Zone |
2003-07-24 | Well Abandoned |
2003-07-24 | Well Fluid changed to Crude Oil |
2003-07-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-02-06 | Perforation | 996.30 | 997.20 | 13 |
1984-02-06 | Perforation | 998.00 | 999.00 | 13 |
2003-07-12 | Packing Device Capped w/Cement | 985.00 | 993.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 7753 | 0.0 | 0.0 | 0.0 |
1985 | 8456 | 0.0 | 0.0 | 0.0 |
1986 | 8472 | 0.0 | 0.0 | 0.0 |
1987 | 8579 | 0.0 | 0.0 | 0.0 |
1988 | 7923 | 0.0 | 0.0 | 0.0 |
1989 | 8473 | 0.0 | 0.0 | 0.0 |
1990 | 7984 | 0.0 | 0.0 | 0.0 |
1991 | 8258 | 0.0 | 0.0 | 0.0 |
1992 | 8724 | 0.0 | 0.0 | 0.0 |
1993 | 8317 | 0.0 | 0.0 | 0.0 |
1994 | 8669 | 0.0 | 0.0 | 0.0 |
1995 | 8626 | 0.0 | 0.0 | 0.0 |
1996 | 8652 | 0.0 | 0.0 | 0.0 |
1997 | 7030 | 0.0 | 0.0 | 0.0 |
1998 | 6181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]