X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141104000

Well Details

Well ID: 0404141104000
Loading map...
Location: 00/04-11-040-14W4/0
Location Alias: 00/04-11-40-14 W4M
Location Alias 2: 00/04-11-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: PRED HZ HALKIRKE 4-11-40-14
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0426742
License Date: 2010-12-01
License Status: Abandoned
Spud Date: 2011-01-04
Final Drill Date: 2011-01-15
Well Total Depth: 2157.00 m
Surface Hole Latitude: 52.424001
Surface Hole Longitude: -111.901125

For data sources see[1][2]

Well History

Date Event
2010-12-01 Obtained License
2011-01-05 Surface Casing Operation Performed
2011-01-06 Direction Drilling Operation Performed - Horizontal
2011-01-09 Intermediate Casing Operation Performed
2011-01-15 Finished Drilling
2011-01-15 Well Mode changed to Drilled and Cased
2011-01-17 Liner Casing Operation Performed
2011-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-17 Perforation Treatment Performed - Open-Hole Completion
2011-01-18 Rig Released
2011-01-20 Well Log Performed
2011-02-11 Well Began Production
2011-02-11 Well Fluid changed to Crude Oil
2011-02-11 Well Mode changed to Pumping
2011-03-19 Well Log Performed
2017-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-24 Plug Back Performed
2017-10-24 Well Fluid changed to Crude Oil
2017-10-24 Well Mode changed to Abandoned Zone
2017-11-28 Well Abandoned
2017-11-28 Well Fluid changed to Crude Oil
2017-11-28 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-06 640.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-17 Open Hole/Barefoot Completion 2154.00 2157.00 0
2011-01-17 Multi-Stage Fracture 2026.00 2026.10 0
2011-01-17 Multi-Stage Fracture 2118.00 2118.10 0
2017-10-24 Packing Device Capped w/Cement 984.80 1032.40 0
2011-01-17 Multi-Stage Fracture 1180.70 1180.80 0
2011-01-17 Multi-Stage Fracture 1279.10 1279.20 0
2011-01-17 Multi-Stage Fracture 1377.60 1377.70 0
2011-01-17 Multi-Stage Fracture 1476.10 1476.20 0
2011-01-17 Multi-Stage Fracture 1574.50 1574.60 0
2011-01-17 Multi-Stage Fracture 1743.90 1744.00 0
2011-01-17 Multi-Stage Fracture 1842.40 1842.50 0
2011-01-17 Multi-Stage Fracture 1927.60 1927.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5832 0.0 0.0 0.0
2012 6713 0.0 0.0 0.0
2013 1896 0.0 0.0 0.0
2014 2496 0.0 0.0 0.0
2015 888 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References