X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141302002

Well Details

Well ID: 0404141302002
Loading map...
Location: 00/02-13-040-14W4/2
Location Alias: 00/02-13-40-14 W4M
Location Alias 2: 00/02-13-040-14 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 13
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 2-13-40-14
Operator Name: Karve Energy Inc.
License Number: 0199132
License Date: 1997-03-10
License Status: Suspension
Spud Date: 1997-07-07
Final Drill Date: 1997-07-18
Well Total Depth: 1066.00 m
Surface Hole Latitude: 52.436949
Surface Hole Longitude: -111.889058

For data sources see[1][2]

Well History

Date Event
1997-03-10 Obtained License
1997-07-07 Surface Casing Operation Performed
1997-07-15 Well Log Performed
1997-07-16 Direction Drilling Operation Performed - Deviate
1997-07-18 Finished Drilling
1997-07-18 Well Log Performed
1997-07-18 Well Mode changed to Drilled and Cased
1997-07-19 Production Casing Operation Performed
1997-07-19 Rig Released
1997-07-28 Well Log Performed
1997-09-30 Perforation Treatment Performed - Jet Perforation
1997-10-02 Well Mode changed to Drilled and Cased
1997-10-03 Perforation Treatment Performed - Jet Perforation
1997-10-03 Well Log Performed
1999-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-31 Plug Back Performed
1999-05-31 Well Mode changed to Abandoned Zone
1999-06-01 Perforation Treatment Performed - Jet Perforation
1999-06-02 Well Log Performed
2009-12-10 Perforation Treatment Performed - Jet Perforation
2009-12-12 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-16 475.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-30 Perforation 1014.00 1015.00 17
1997-10-03 Perforation 1025.00 1026.50 14
1997-10-03 Perforation 1030.00 1031.50 14
1999-05-31 Packing Device Capped w/Cement 997.00 1005.00 0
1999-06-01 Perforation 848.00 850.00 14
2009-12-10 Perforation 848.00 858.00 17
2009-12-10 Perforation 861.50 867.50 17
2009-12-12 Fracture 848.00 867.50 0

For data sources see[5]



References