X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141406000

Well Details

Well ID: 0404141406000
Loading map...
Location: 00/06-14-040-14W4/0
Location Alias: 00/06-14-40-14 W4M
Location Alias 2: 00/06-14-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 6-14-40-14
Operator Name: Karve Energy Inc.
License Number: 0421823
License Date: 2010-07-13
License Status: Issued
Spud Date: 2010-09-04
Final Drill Date: 2010-09-09
Well Total Depth: 2172.00 m
Surface Hole Latitude: 52.437631
Surface Hole Longitude: -111.897595

For data sources see[1][2]

Well History

Date Event
2010-07-13 Obtained License
2010-09-04 Surface Casing Operation Performed
2010-09-05 Direction Drilling Operation Performed - Horizontal
2010-09-05 Intermediate Casing Operation Performed
2010-09-05 Well Log Performed
2010-09-07 Well Log Performed
2010-09-09 Finished Drilling
2010-09-09 Well Mode changed to Drilled and Cased
2010-09-10 Liner Casing Operation Performed
2010-09-11 Perforation Treatment Performed - Open-Hole Completion
2010-09-11 Rig Released
2010-09-19 Well Log Performed
2010-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-28 Well Began Production
2010-09-28 Well Fluid changed to Crude Oil
2010-09-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-05 511.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-11 Open Hole/Barefoot Completion 1067.00 2172.00 0
2010-09-28 Multi-Stage Fracture 1484.00 1484.10 0
2010-09-28 Multi-Stage Fracture 1412.00 1412.10 0
2010-09-28 Multi-Stage Fracture 1339.00 1339.10 0
2010-09-28 Multi-Stage Fracture 1267.00 1267.10 0
2010-09-28 Multi-Stage Fracture 1194.00 1194.10 0
2010-09-28 Multi-Stage Fracture 1122.00 1122.10 0
2010-09-28 Multi-Stage Fracture 2136.00 2136.10 0
2010-09-28 Multi-Stage Fracture 2032.00 2032.10 0
2010-09-28 Multi-Stage Fracture 1946.00 1946.10 0
2010-09-28 Multi-Stage Fracture 1860.00 1860.10 0
2010-09-28 Multi-Stage Fracture 1774.00 1774.10 0
2010-09-28 Multi-Stage Fracture 1702.00 1702.10 0
2010-09-28 Multi-Stage Fracture 1629.00 1629.10 0
2010-09-28 Multi-Stage Fracture 1557.00 1557.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1398 0.0 0.0 0.0
2011 7492 0.0 0.0 0.0
2012 8154 0.0 0.0 0.0
2013 7971 0.0 0.0 0.0
2014 8127 0.0 0.0 0.0
2015 8617 0.0 0.0 0.0
2016 8714 0.0 0.0 0.0
2017 8637 0.0 0.0 0.0
2018 8590 0.0 0.0 0.0
2019 8262 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References